Similar Projects
Brewster-Douglas Housing Project Redevelopment
New Construction, Demolition - 79,000 SF
Design
$300,000,000 est. value
Detroit, MI 48201

Gull Lake Community Schools Storage and Maintenance Buildings
Post-Bid
Richland, MI 49083

Forest View Renovations
Renovation
Post-Bid
Cadillac, MI

Construction Management Services
Results
Ann Arbor, MI

Addition To The Richfield Early Learning Center
New Construction, Renovation - 13,086 SF
Results
Flint, MI 48500

Immanuel Lutheran Church and School
Renovation, Addition
Construction
$6,500,000 est. value
Warren, MI 48044

Academy of Warren Professional Construction Manager
New Construction, Renovation
Construction
$6,500,000 est. value
Warren, MI 48089

East Grand Rapids Public Schools Wealthy, Breton Downs and Lakeside Remodeling
Post-Bid
Grand Rapids, MI 49506

Kingston Schools - Bid Package 3
Results
Kingston, MI

Early Childhood Education Center
New Construction - 58,000 SF
Construction
$15,000,000 est. value
Detroit, MI

Ford Career-Technical Center Addition and Remodeling Project
Renovation, Addition
Post-Bid
Westland, MI

Coldwater Community Schools - New 4 / 5 Elementary School
Results
Coldwater, MI

2019 Bond Renovations- Bid Package 1 - Crowley Center, Foote Elementary School, Mixter Institute, and Paun Elementary School
Renovation
Construction
Lincoln Park, MI

2018 Bond Projects, Oakwood Elementary Addition. Portland School District
Addition
Post-Bid
Portland, MI

Brookside Classroom Addition
Results
$1,800,000 to $2,300,000 est. value
Cassopolis, MI

Reported 01/22/2020 12:00 AM
Project Title

Churchill and Lincoln Park Elementary Remodel

Physical Address View project details and contacts
City, State (County) Muskegon, MI   (Muskegon County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Building Footings/Foundations & Flatwork Site & Building Earthwork/Utilities Asphalt Paving Site Concrete Landscaping & Playground Equipment Masonry Structural Steel Athletic & Gymnasium Equipment Carpentry & General Trades Metal Roof & Wall Panels Membrane Roofing Sealants Aluminum, Glass & Glazing Drywall & Related Interior Trades Hard Tile Wood Flooring Resilient & Carpet Flooring Painting Lockers Operable/Folding Partitions & Overhead Coiling Doors Food Service Equipment Bleachers Mechanical – Plumbing - HVAC Testing & Balancing Electrical Fire Suppression Signage Network Infrastructure Audio Visual & Communications Systems Access & Control Lockdown Security Cameras Fencing

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents