Similar Projects
Scheduled and Emergency Drainage Repairs and Improvements at Various Locations
Bidding
$680,575 est. value

Foster Avenue Revetment Improvement Project
Post-Bid
Less than $800,000 est. value
Marshfield, MA 02050

WSP Culvert Storm Drain and Water Pipe Along with Related Products
Post-Bid
Carver, MA

Concrete Seawall
Results
Less than $1,177,790 est. value
Hull, MA

Duxbury Beach Seawalls Phase I
Results
Less than $4,500,000 est. value
Duxbury, MA

Routine Maintenance and Drain Repairs
Post-Bid
Brockton, MA

West Elm Street Bridge Replacement
Results
Less than $670,000 est. value
Brockton, MA

Scheduled and Emergency Drainage Repairs and Improvements at various Locations
Results
Less than $685,975 est. value

Scheduled and Emergency Drainage Structure Reconstruction and Repairs at Various Locations
Results
Less than $637,000 est. value

Bay Avenue Seawall Repairs and Improvements
Results
Less than $400,000 est. value
Marshfield, MA 02050

Warren Cove Seawall Rehabilitation
Results
Less than $3,500,000 est. value
Plymouth, MA 02360

Construction of an Infiltration Basin with Vegetated Side Slopes and Site Grading; Soccer Field Parking Lot; Ted Williams Camp
Results
Lakeville, MA 02347

Installation of Catch Basins and Grading Soccer Field Parking Lot at Ted Williams Camp
Results
Lakeville, MA 02347

Tiffany Road Drainage and Pavement Improvements
Results
$900,000 est. value
Norwell, MA 02061

Scheduled and Emergency Drainage Structure and Pipe Cleaning at Various Locations
Results
Less than $470,000 est. value

Last Updated 08/12/2020 08:26 AM
Project Title

Egypt-Mann Hill Beach Cobble Berm Reconstruction Project

Physical Address View project details and contacts
City, State (County) Scituate, MA 02066   (Plymouth County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,093,185
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Generally consists of furnishing all labor, materials, equipment, and incidentals to the beach reconstruction. This work shall consist of, Dig Safe notifications, verification of benchmark elevations, investigation of existing residence structures in proximity of work, handling ocean tides and waves, surface runoff and groundwater, and reconstruction to limits shown on plans for the construction of the cobble berm repairs. Cobble material will be stockpiled in the staging area and spread throughout the project area to the lines and grades shown on the plans. Two staging areas are proposed, at either end of the site as shown on the contract drawings. The work also includes but is not limited to, all forms, cobble stones, labor, machinery, and materials required to complete the project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.