Similar Projects
Vancouver Innovation Center Master Plan
New Construction, Renovation, Infrastructure
Conception
Vancouver, WA 98683

US 12/Ackley Rd/Clover Lane - Intersection Safety Improvements
Alteration
Conception
$1,008,000 est. value
Leavenworth, WA

Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

SR 500/NE Robinson Rd and NE 3rd St. - Intersection Safety Improvements
Infrastructure
Design
$4,459,000 est. value
Vancouver, WA 98687

Fruit Valley Modernization
New Construction, Alteration
Bidding
$3,000,000 est. value
Vancouver, WA 98660

Fire Protection System Upgrades and Miscellaneous Piping at the Wells Hydroelectric Project
Infrastructure, Alteration
Bidding
$300,000 est. value
Wenatchee, WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

N 6th St/ N 8th St Concrete Pavement Repair Project
Infrastructure
Post-Bid
Washougal, WA 98671

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Royle Road S 19th to 460 LF N of S 15th
Infrastructure
Results
$2,350,000 est. value
Ridgefield, WA 98642

Clallam Bay and Sekiu Water System Upgrades
Infrastructure
Bidding
$4,215,000 est. value
Clallam Bay, WA

Asphalt Crushing Services
Infrastructure
Post-Bid
Longview, WA

Water Meter Changeout
Infrastructure
Results
WA

Rehab Campground Water System Olympic National Park
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Port Angeles, WA 98362

Call for Artists Highway Two Easy Street Roundabout
Infrastructure
Post-Bid
$175,000 to $200,000 est. value
Wenatchee, WA

Last Updated 07/06/2022 12:40 AM
Project Title

HOH-Clearwater Mainline MP15 Road Repair

Physical Address View project details and contacts
City, State (County) Forks, WA   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $364,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Erosion Control/Slope, Bank Stabilization, Culverts, Waterways, Stormwater Channels, Construction, Excavation, Erosion Control - Temporary Description: The project consists of: o Installing temporary traffic control, erosion and sediment control measures prior to clearing and grading, o Removing the existing asphalt pavement (2,270 sq yd), o Excavating approximately 8,190 cy of unsuitable material from the existing embankment, o Hauling to a waste area and, o Installing a drainage blanket on the excavation slope and a perforated drainage system at the toe of the excavation and rebuilding the embankment (8,045 cy) with common borrow material. The project is located at the milepost 15 on the HOH-Clearwater Mainline.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents