Similar Projects
Repair Slumps on Hurricane Ridge and Obstruction Point Road
Alteration
Design
Port Angeles, WA

Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

Jan Road Levee Setback Construction
Alteration
Bidding
$9,000,000 est. value
WA

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Bidding
$165,000,000 to $180,000,000 est. value
WA

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

Lower Satsop Right Bank Conservation
Infrastructure
Post-Bid
Montesano, WA

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

2021 Horse Creek Streambed Repairs Project
Infrastructure
Results
$90,000 to $100,000 est. value
Bothell, WA 98011

Fall City Floodplain Restoration Planting
Alteration
Design
$1,000,000 est. value
WA

May Cr in Vic of Dowans Ck Rd Ground Anchor Load Testing
Infrastructure
Bidding
$600,000 to $750,000 est. value
WA

Fakkema Access Road
Infrastructure
Post-Bid
$650,000 to $850,000 est. value
Oak Harbor, WA 98277

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

Chumstick Creek Motteler Drive Culvert Replacement
Infrastructure
Bidding
$320,000 to $354,000 est. value
Leavenworth, WA 98826

Small Works Roster - Avenue NE Storm Repair - Phase One
Infrastructure
Post-Bid
Arlington, WA 98223

Storm Renewal and Replacement Project
Infrastructure
Results
$620,000 to $650,000 est. value
Auburn, WA 98092

Reported 03/26/2022 12:00 AM
Project Title

Rehabilitate Seawall

Physical Address View project details and contacts
City, State (County) Grand Coulee, WA 99133   (Lincoln County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate a failing seawall at Spring Canyon boat launch on Lake Roosevelt (a reservoir): - Partial demolition of an existing approximately 200 lineal foot timber pile seawall and associated appurtenances; - Construction of a new replacement reinforced cast-in-place concrete seawall; - Armoring the waterward side of the seawall with quarry spall backfill; and - Filling and grading behind the seawall, within an existing grass area, to create a flatter transition between the seawall and the existing parking lot.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents