Similar Projects
Well 3 and One for Well 4
Post-Bid
$28,000 est. value
Sandwich, MA

Well Cleaning and Reconditioning
Infrastructure
Post-Bid
West Yarmouth, MA

Church Lane Gravel Packed Well Redevelopment and Pump Repair
Results
Sagamore, MA

Well 3 Redevelopment
Results
Less than $25,000 est. value
Brewster, MA

Well Redevelopment at the Knowles Crossing Wellfield
Infrastructure
Post-Bid
Provincetown, MA

Remove Skidmore Condensate Pumps, Floats and Controls
Results
Orleans, MA

Fire Training Academy Groundwater Pump and Treatment System Maintenance and Monitoring
Term Contract
Post-Bid
$60,000 est. value
Barnstable, MA 02668

Well Cleaning and Reconditioning of 5 Water Wells
Term Contract
Results
$100,000 est. value
Yarmouth, MA

Contract 13 District H Water Supply Wells and Pump Station
Renovation, Infrastructure - 1,200 SF
Post-Bid
$2,400,000 est. value
Eastham, MA

Fy22 Osterville Field Irrigation Well Project
Infrastructure
Results
$25,000 est. value
Barnstable, MA

Water Treatment Plant Pump Replacement
Infrastructure
Results
$130,000 est. value
Orleans, MA 02653

Booster Station Rental
Infrastructure
Results
Barnstable, MA

Water Department Garage Heaters Venting Replacement and Water Treatment Office Heater Installation Project
Infrastructure, Alteration
Results
$35,000 est. value
Brewster, MA

Knowles Crossing Well Redevelopment
Infrastructure
Results
$120,000 est. value
Provincetown, MA

Cleaning Four Gravel Packed Wells
Infrastructure
Results
Dennis, MA

Last Updated 06/09/2022 01:53 AM
Project Title

Cleaning and Redeveloping Well 1

Physical Address View project details and contacts
City, State (County) Orleans, MA   (Barnstable County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Providing labor, materials and equipment in accordance with Mass General Law Chapter 30B, Section 5 for the Cleaning & Redeveloping well #6 for the Orleans Water Department.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents