Similar Projects
Reported 06/03/2020 12:00 AM
Project Title

Hollywood Remove Sludge Removal

Physical Address View project details and contacts
City, State (County) PA   (Clearfield County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Two (2) methods of sludge removal shall be acceptable. The first method of sludge removal consists of removing and hauling the sludge an approximate distance of five hundred feet (500’) to be stockpiled at the locations indicated on Attachment B – Exhibit 1. The second method consists of pumping and disposing of the sludge into the plant’s sludge disposal borehole located approximately three thousand seven hundred feet (3,700’) from the backup sludge lagoon as shown on Attachment B – Exhibit 2. Temporary sludge lines to the borehole must follow and stay within the limits of the existing sludge disposal pipeline permanent easement. All work shall be conducted in accordance with the terms of this bid proposal and as directed by the Department’s Representative.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents