Similar Projects
Reported | 06/03/2020 12:00 AM |
Project Title | Hollywood Remove Sludge Removal |
Physical Address | View project details and contacts |
City, State (County) | PA (Clearfield County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Hauling |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Two (2) methods of sludge removal shall be acceptable. The first method of sludge removal consists of removing and hauling the sludge an approximate distance of five hundred feet (500’) to be stockpiled at the locations indicated on Attachment B – Exhibit 1. The second method consists of pumping and disposing of the sludge into the plant’s sludge disposal borehole located approximately three thousand seven hundred feet (3,700’) from the backup sludge lagoon as shown on Attachment B – Exhibit 2. Temporary sludge lines to the borehole must follow and stay within the limits of the existing sludge disposal pipeline permanent easement. All work shall be conducted in accordance with the terms of this bid proposal and as directed by the Department’s Representative. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |