Similar Projects
The Piazza at Former Star City Site - Master Plan
New Construction - 51,100 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Bridgeville, PA 15017

Monongahela Riverfront for Recreational Use - Master Plan
New Construction
Conception
Pittsburgh, PA 15207

Pittsburgh Penguins Former Arena Site - Entertainment Facility by Live Nation and Parking Garage
New Construction - 40,000 SF
Design
$3,000,000 est. value
Pittsburgh, PA 15219

Lot 10 - North Shore Entertainment Building and Plaza
New Construction
Design
$4,500,000 est. value
Pittsburgh, PA 15212

Josephine Playground Improvements
Infrastructure
Bidding
East McKeesport, PA

South Park Trail Improvement Project
Post-Bid
South Park Township, PA 15129

Alterations to Field #6
Post-Bid
Gibsonia, PA 15044

North Park Tennis Field House Revitalization
Results
Pittsburgh, PA 15219

Gillott Park Playground Upgrade
Results
Bellevue, PA 15202

Hazelwood Green Plaza
New Construction - 86,196 SF
Construction
$4,975,000 est. value
Pittsburgh, PA 15207

3 Crossings Phase 2 - Building G Hopper Place Office and Park
New Construction - 150,000 SF
Construction
$12,575,000 est. value
Pittsburgh, PA 15222

Kaufmann's Grand on Fifth - Rooftop Ice Skating Rink
New Construction
Conception
Pittsburgh, PA

Frick Park - Phase 2
Renovation
Design
Pittsburgh, PA 15217

Addition to the Stadium Bleachers
Post-Bid
Pittsburgh, PA 15237

CITF GEDF Beedle Park Concession Stand Project
Results
Jefferson Hills, PA

Last Updated 07/12/2021 10:59 AM
Project Title

South Fayette Fairview Park Phase 1 - General Contract

Physical Address View project details and contacts
City, State (County) Morgan, PA   (Allegheny County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,065,000 to $1,850,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of site grading of planned recreational facilities; stormwater management facilities; paving the access drive and parking areas; milling and paving a portion of access drive, utility infrastructure to service planned recreational facilities including electrical, water and sewer; lighting in the parking area, a fenced in dog park with a small pavilion; and concrete and asphalt sidewalks throughout.

Details

Division 01 - General Requirements, Construction Facilities.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Unit Paving, Asphalt Unit Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents