Similar Projects
One Time Purchase of Electrical Supplies for Repairs at Waggaman Playground
Term Contract
Sub-Bidding
$194,000 CJ est. value
Westwego, LA 70094

Design, Engineer and Install New Owner-Supplied Transfer Switches at Various Fire Stations
Renovation
Sub-Bidding
$120,000 CJ est. value
Kenner, LA 70065

Greek Plots
New Construction
Post-Bid
$500,000 to $1,000,000 est. value
New Orleans, LA 70122

(1) 750 KVA 3 Phase Pad Mount Transformers
Infrastructure
Post-Bid

Lakefront Parking Garage - Phase II
New Construction, Alteration
Results
Lake Charles, LA

Cathodic Protection Survey
Term Contract
Results
Barksdale AFB, LA 71110

LSU Union Square Parking Garage Lighting Upgrade
Renovation
Sub-Bidding
$2,276,000 CJ est. value
Baton Rouge, LA 70803

8 KW LED Light Towers for the Jefferson Parish Department of Parks and Recreation
Alteration
Post-Bid
LA

Emergency Generator Replacement of Lake Charles Civic Center
Alteration
Results
Lake Charles, LA 70601

NORDC Parks - Hurricane Isaac Repairs PW526 - Group 1
Alteration
Post-Bid
New Orleans, LA 70127

Power Generator for DPS
Alteration
Results
Baton Rouge, LA 70806

NORDC Parks - Hurricane Isaac Repairs PW526 - Group 2
Alteration
Post-Bid
New Orleans, LA 70124

Return to Storage and Required Repairs for Generators
Alteration
Results
Baton Rouge, LA 70814

Purchase a Total of 5 Generators for our Lift Stations
Alteration
Post-Bid
Westwego, LA

AP Jail Electrical Upgrades Phase 1
Alteration
Results
Donaldsonville, LA 70346

Last Updated 08/06/2023 12:19 AM
Project Title

New Standby Emergency Generator, West End Dormitory, Rockefeller Wildlife Refuge

Physical Address View project details and contacts
City, State (County) Grand Chenier, LA 70643   (Cameron County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $515,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

New Standby Emergency Generator West End Dormitory Rockefeller Wildlife Refuge ALTERNATE NO. 1 includes, but is not limited to, the provision of all project work which is required to re-connect the existing sewage-treatment plant to the West End Dormitory, electrical distribution system so as to be backet up with emergency electrical power from the project emergency, electrical, power-generation system. Questions about this procedure shall be directed to the Designer at: Nesbit & Associates, LLC 11853 Market Place Avenue Baton Rouge, LA 70816 Telephone: 225-291-9266 E-mail: dannynesbit@nesbitandassociates.com All bids shall be accompanied by bid security in an amount of five percent (5.0%) of the sum of the base bid and all alternates. The form of this security shall be as stated in the Instructions to Bidders included in the Bid Documents for this project. The successful Bidder shall be required to furnish a Performance and Payment Bond written as described in the Instructions to Bidders included in the Bid Documents for this project. Bids shall be accepted from Contractors who are licensed under LA. R.S. 37:2150-2192 for the classification of Electrical Work. Bidder is required to comply with provisions and requirements of LA R.S. 38:2212(B)(5). No bid may be withdrawn for a period of forty-five (45) days after receipt of bids, except under the provisions of LA. R.S. 38:2214. The Owner reserves the right to reject any and all bids for just cause. In accordance with La. R.S. 38:2212(B)(1), the provisions and requirements of this Section and those stated in the bidding documents shall not be waived by any entity. When this project is financed either partially or entirely with State Bonds or financed in whole or in part by federal or other funds which are not readily available at the time bids are received, the award of this Contract is contingent upon the granting of lines of credit, or the sale of bonds by the Bond Commission or the availability of federal or other funds. The State shall incur no obligation to the Contractor until the Contract Between Owner and Contractor is fully executed. Completion- 365 consecutive calendar days, State ID No. S27449 Site Code: 5-12-001

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents