Similar Projects
Water Transmission Pipeline
Infrastructure
Bidding
$15,000,000 to $20,000,000 est. value
Sherwood, OR 97140

2022 Waterline Replacement Project
Infrastructure
Bidding
Gresham, OR

Groundwater Alliance Package No 5
Infrastructure
Post-Bid
Gresham, OR

Water System Improvements - Phase I - Collector Well No. 3 - 2022
Infrastructure
Post-Bid
$2,600,000 to $2,900,000 est. value
Boardman, OR

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

Awbrey Butte Distribution Improvements
Alteration
Results
Bend, OR

2022 Re-Pipe
Infrastructure
Bidding
Beaverton, OR 97007

Gresham Deep Drywell Pilot Project
Infrastructure
Post-Bid
Gresham, OR

Nixyaawii One
Infrastructure
Results
$4,000,000 est. value
Pendleton, OR

Water Distribution Line Replacement Project
Infrastructure
Bidding
Madras, OR

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

Kellogg Creek Water Resource Recovery Facility Influent Pump 2 and 4 Replacement
Infrastructure
Results
$1,342,000 est. value
Milwaukie, OR 97222

Monroe Street Rehabilitation
Infrastructure
Bidding
$355,000 to $375,000 est. value
Harrisburg, OR 97446

South West 209th Avenue Kinnaman Road to Alexander Street 36-Inch PVC Pipe
Infrastructure
Post-Bid
$150,000 to $200,000 est. value
Aloha, OR 97007

North Pipeline Lateral N1 Relocation at NorthWest Martin Road and Highway 47 for Tualatin Valley Irrigation District
Infrastructure
Results
$25,000 to $100,000 est. value
Forest Grove, OR 97116

Reported 04/08/2022 12:00 AM
Project Title

Bly Bley-Was Well Relocation and Waterline

Physical Address View project details and contacts
City, State (County) Bly, OR   (Klamath County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of Construction of a new well, pump house and associated site improvements, approximately 700 feet of 8' DR18 C-900 PVC water main and extension of an existing gravel driveway to connect the new well with the existing Town of Bly water tank, either approximately 2,600 feet of 10' DR18 C-900 PVC water main to connect the Bly to Bley-Was intertie to the Bley-Was water tank or alternatively booster station and associated site improvements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents