Similar Projects
Daphne High School Track Resurfacing Project
Post-Bid
Bay Minette, AL 36507

Synthetic Track Surfacing
Term Contract
Post-Bid
Bay Minette, AL 36507

Playground Design-Build
Results
Orange Beach, AL 36561

Foley Solar Park Project
Results
Foley, AL 365352619

Gulf State Park Enhancements
Post-Bid
Gulf Shores, AL 36542

Mickey Miller Blackwell Stadium- Synthetic Track Runway Resurfacing
Results
Less than $49,999 est. value
Gulf Shores, AL 36542

Daphne Tennis Center and Restroom Facility at Lott Park
New Construction
Post-Bid
Daphne, AL

Park Improvements at Morgantown Water Access - Boardwalk Extension
Results
AL

Foley Downtown Improvements 2021
Post-Bid
Foley, AL 36535

Spirit Park Field 1 Infield Improvements
Results
Spanish Fort, AL 36527

Recreation Center Drainage and Tennis Center Court Improvements
Results
Less than $1,460,905 est. value
Orange Beach, AL 36561

Rotary Club Basketball Court
Results
Less than $39,018 est. value
Fairhope, AL 36532

Little Lagoon Pass Park Improvements
Results
Less than $130,652 est. value
Gulf Shores, AL 36542

Clay Tennis Court Repair
Results
Less than $38,019 est. value
Fairhope, AL 36532

George C. Meyer/Johnnie Sims Tennis Complex Restoration
Results
Gulf Shores, AL 36542

Last Updated 05/12/2020 02:12 PM
Project Title

Recreation Center Drainage & Tennis Court Improvements

Physical Address View project details and contacts
City, State (County) Orange Beach, AL 36561   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,460,905
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the renovation and upgrading of the existing drainage infrastructure, detention areas, outfall ditches and the existing tennis courts located at the City of Orange Beach Recreation Center property. The existing drainage infrastructure improvement includes 1300 LF of pipe upgrades, excavation of existing detention basin (5,550 CY of unclassified excavation), 1,360 LF of ditch widening, stabilization and grass establishment for disturbed areas, and 2,600 SY of parking lot resurfacing. The Tennis Center improvements include removal of all fencing, furniture, existing asphalt, backfilling and grading base to proposed elevations, new asphalt surface, new fence, new lighting poles and fixtures, new nets and furniture, and court painting and striping. A total of Eighty (80) working days will be allowed for completion of work.

Details

Division 11 - Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Athletic and Recreational Special Construction.
Division 26 - Electrical, Exterior Lighting.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents