Similar Projects
Pediatrics Plus Facility
New Construction - 7,900 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Bryant, AR

Construction Managers
New Construction
Bidding
Texarkana, AR

Construction Managers
New Construction, Renovation
Bidding
Cabot, AR

Construction Managers and Architects - Various New Construction and Renovation Projects Districtwide
New Construction, Renovation
Post-Bid
Kirby, AR 71950

Construction Manager for Various Renovation Projects
Renovation
Post-Bid
Yellville, AR

Summer Renovation Projects
Renovation
Results
Salem, AR

Construction Manager for School Facility
Results
Benton, AR

Forrest City High School Industrial Arts Building
New Construction
Construction
Forrest City, AR 72335

Fort Smith Peak Innovation Center
New Construction, Renovation - 160,000 SF
Construction
$10,000,000 CJ est. value
Fort Smith, AR 72903

Addition to the Band Room at the West Memphis Senior High School
Addition
Bidding
West Memphis, AR 72301

Construction Manager for The Fountain Lake School District
New Construction
Post-Bid
Hot Springs, AR

MacArthur School Addition
Renovation, Addition
Results
Jonesboro, AR 72401

New Middle School
New Construction
Post-Bid
Fayetteville, AR

El Dorado High School Athletic Training Classroom Addition
Addition
Results
El Dorado, AR 71730

Maintenance Warehouse Project
New Construction
Post-Bid
Pearcy, AR 71964

Reported 03/04/2022 12:00 AM
Project Title

East End Middle School Addition

Physical Address View project details and contacts
City, State (County) Hensley, AR 72065   (Saline County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

East End Middle School Addition will be a 8,860 square feet addition to the existing East End Middle School. Trade Package 1 – Concrete Trade Package 2 – Masonry Trade Package 3 – Structural and Miscellaneous Steel (Supply) Trade Package 4 – Structural and Miscellaneous Steel (Install) Trade Package 5 – Waterproofing, Dampproofing, Joint Sealants Trade Package 6 – Millwork Trade Package 7 – Metal Roof and Wall Panels Trade Package 8 – Storefront, Glass, Glazing Trade Package 9 – Light Gauge Framing, Drywall, Acoustical Trade Package 10 – Tile and Commercial Flooring Trade Package 11 – Epoxy Flooring Trade Package 12 – Polished Concrete Finish Trade Package 13 – Painting and Wallcovering Trade Package 14 – Doors ,Frames, Hardware, and Div. 10 Supply Trade Package 15 – Overhead Coiling Doors and Operable Partition Trade Package 16 – Window Treatment Trade Package 17 – Fire Suppression Trade Package 18 – Plumbing Trade Package 19 – Heating, Ventilation, Air Conditioning Trade Package 20 – Mechanical Trade Package 21 – Electrical, Communication, and Electronic Safety

Details

Middle/Senior High School, 8,860 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents