Similar Projects
Pedestrian Safety Improvement
Bidding
$454,757 est. value
FL

Sidewalk (BDI)
Bidding
$315,525 est. value
Ponce de Leon, FL 32455

Construct North 7th Street Sidewalk
Term Contract
Post-Bid
Lantana, FL 33462

Salt Lake (Entry Improvements)
Post-Bid
Less than $75,000 est. value
Mims, FL 32754

SW 27th Multi-Use Path
Results
Less than $367,000 est. value
Gainesville, FL

Fisherman's Landing Shoreline Protection and Parking Improvements
Results
Less than $580,000 est. value
Sebastian, FL 32958

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

LDS Church – Ocala Stake Suite and Parking Lot Additions
Addition - 1,700 SF
Construction
Ocala, FL 34471

South Coast Greenway Trail, Phase 1A - Shell Point (LAP)
Bidding
$2,249,150 est. value
Ruskin, FL 33570

City of Plant City Sidewalk Improvements
Post-Bid
Plant City, FL 33564

San Pablo Right Turn Lane Project
Results
Less than $89,370 est. value
Jacksonville, FL

FedEx Ocala Hub Parking Expansion
Addition
Construction
Ocala, FL 34475

West Terry Street Pathway Extension Project
Bidding
Bonita Springs, FL

Sidewalk Replacement at Public Housing Property
Post-Bid
Eustis, FL 32726

Broward MPO Regional Complete Streets Initiative
Results
FL

Last Updated 03/16/2021 02:58 PM
Project Title

Rainbow Lakes Estates Fire Station 1 Parking Lot Resurfacing/ Pothole and Shoulder Repair Ivy Place

Physical Address View project details and contacts
City, State (County) FL   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $32,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. This project involves reclaiming and resurfacing of approximately 10,350 SF of the Rainbow Lakes Estates Fire Station # 1 Parking Lot. Reclaim and resurface work involves parking lot prep, minor clearing and grubbing, importing limerock to re-establish 2% slope, reclaiming and resurfacing and stabilizing all areas disturbed during construction. There will be no temporary or permanent striping required for this project. 2. This project involves pothole and shoulder repair on Ivy Place at various locations, mainly along the edge of pavement.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents