Similar Projects
Jones Farm
New Construction, Infrastructure
Conception
$704,300,000 CJ est. value
Duette, FL 34219

CWWTP - Injection Well - DEP Requirement Central Wastewater Treatment Plant (CWWTP) - City of Fort Myers
Infrastructure
Conception
$22,410,000 CJ est. value
Fort Myers, FL 33916

The Vue at Clermont
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Clermont, FL 34711

The Fletch
New Construction, Infrastructure - 12,621 SF
Design
$3,700,000 CJ est. value
Hollywood, FL 33020

Jackson Court and Chevy Chase Boulevard Seawall Replacements
Infrastructure
Bidding
$200,000 CJ est. value
Satellite Beach, FL 32937

Lift Station 76 Reconstruction and New Force Main - Rebid
Demolition, New Construction, Infrastructure
Bidding
$4,051,612 CJ est. value
Crawfordville, FL 32327

Minneola Athletic Complex - Site Lighting
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Minneola, FL 34715

Main Street Detention Pond Outflow Filter - Project
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Gainesville, FL 32601

11 Acre Parks and Recreation Site Development
Infrastructure
Post-Bid
Pompano Beach, FL

Flow Equalization Basin and Sludge Thickening and Digesters Rehabilitation
Renovation
Post-Bid
Rockledge, FL

Repair and Rehabilitation of Effluent Transfer Pump and Motor 5 at WWTP 3
New Construction
Results
Less than $63,425 est. value
Winter Haven, FL

Tradewinds Park Educational Farm and Gardens
New Construction
Results
$8,500,000 est. value
Coconut Creek, FL 33066

Titusville Point - Site Development
New Construction
Construction
Titusville, FL 32780

FD LLC Fort Pierce - Site Development
New Construction
Construction
$300,000 est. value
Fort Pierce, FL 34947

Ponce Park Tower
New Construction, Infrastructure - 15,671 SF
Pending Verification
$34,000,000 CJ est. value
Coral Gables, FL 33145

Last Updated 08/17/2022 03:06 PM
Project Title

Ridaught Water Treatment Plant (WTP) Ground Storage Tank (GST) Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Middleburg, FL 32068   (Clay County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

Scope The Contractor shall perform the Work complete, in place and make ready for construction of a new aerator, new chemical feed lines, rehabilitating the ground storage tank (GST), and new GST influent raw water piping for the Ridaught WTP to provide a fully functional GST system as described in the Contract Documents. The work and includes all labor, materials, equipment, permits, and incidentals necessary to perform, but is not limited to, the following: 1. Mobilization/Demobilization, General Requirements, Bonds and Insurance. 2. Contractor is responsible for protecting existing materials, structures, and equipment on-site during construction activities. 3. Site Work a. Site Preparation b. Erosion Control c. Salvage: Prior to demolition of equipment or facilities, the Contractor shall coordinate with the Owner on any Owner designated equipment identified to be salvaged. Contractor shall move the identified equipment and/or materials to the warehouse located on-site. d. Demolition as shown on the drawings. e. Site restoration including sodding and other restoration. Filling of demolished old pressure sustaining valve vault area as appropriate. Contractor agrees to restore as necessary, any systems that might be impacted during construction. Restoration of the project site to pre-construction condition. 4. Structural Work a. Rehabilitate the existing GST as shown on the drawings. b. Install new guardrails around the perimeter of the GST roof. c. Install new aerator curb and plug all existing roof penetrations no longer in service. d. Install new valve assembly equipment pad. 5. Mechanical Work a. Install a new Cascade Aerator with a 3,800 gallon per minute (GPM) capacity. b. Install a new valve assembly. c. Install two new chemical feed connections, stainless steel spool piece pipe, and two new pressure gauges. d. Install new ductile iron influent mechanical piping to the GST's new aerators shown in the drawing. e. Replace bypass piping from the GST's new aerator. f. Install new hose bib and wash down station g. Cut and install new potable water 3/4 -inch yard piping to hose wash down station. 6. Electrical Work a. Install new conduit to the new task light as shown on the drawings. b. Demolish existing GST electrical conduit and lighting and terminate wiring at side of GST in a newly installed stainless steel junction box as shown on the drawings. B. Electrical, Instrumentation and Control work shall be constructed in accordance with CCUA Water Treatment Plant Standards, drawings, and specifications to provide a functional and integrated new electrical system. C. Conducting all necessary testing and start-up. D. All materials, methods of construction, and standards must be in accordance with the AUTHORITY's approved material manual, specifications, and details (latest version). E. Substantial Completion: To satisfy the definition of Substantial Completion, all on-site Work including punch list items required by the Contract have been completed to where the Contractor can vacate the site and only those elements of submittal and closeout nature remain for the attainment of Final Completion and as previously described.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents