Similar Projects
Gardens of Queen Anne's - Phase II
New Construction
Conception
Stevensville, MD 21666

Fair Hill Eventing Center
Conception
$20,000,000 est. value
Elkton, MD 21921

Beltway Plaza Redevelopment - Master Plan
New Construction - 720,000 SF
Design
$10,000,000 CJ est. value
Greenbelt, MD 20770

Laurel Park Racing Facility Improvements
New Construction
Design
$175,000,000 est. value
Laurel, MD 20724

Creativity Center
New Construction, Build-Out - 6,500 SF
Post-Bid
Baltimore, MD 21224

Observation Deck
New Construction
Post-Bid
Easton, MD 21601

West Campus Amphitheater Repairs
Results
MD

Renovations to the Towanda Recreation Center
Renovation - 4,227 SF
Results
$400,000 to $700,000 est. value
Baltimore, MD 21202

TopGolf
New Construction - 65,000 SF
Construction
Baltimore, MD 21230

White House Construction Manager RFP
Renovation
Construction
Baltimore, MD 21231

The Compass
New Construction
Pending Verification
Baltimore, MD 21201

Moss Pavilion
New Construction
Pending Verification
Accokeek, MD 20607

Heavy Metal Playground
New Construction
Conception
Ocean City, MD 21842

Running Track
Post-Bid
$250,000 to $500,000 est. value
Middle River, MD 21220

Willards Park Pavilion Renovation
Results
Willards, MD 21874

Last Updated 06/21/2021 09:07 AM
Project Title

Accessible Bathrooms/Locker Rooms Therapeutic Pool Holly Center

Physical Address View project details and contacts
City, State (County) Salisbury, MD 21804   (Wicomico County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of Project is defined by the Contract Documents and consists of the following: 1. Demolition work is restricted to the Women’s and Men’s Bathrooms including toilets, showers, dressing and entrance way areas. The limit of disturbance is the doors leading into the pool area and the building corridor. 2. Demolition includes removal of existing ceramic tile flooring in its entirety, cutting the existing concrete floors to remove sanitary pipe to be disconnected and provide new sanitary pipe systems for new plumbing fixture locations. 3. Remove all plumbing fixtures, drains and cleanouts as required to accommodate new layout. Remove all metal toilet and dressing compartments. Remove all toilet and bath accessories including towel and grab bars. 4. Remove all existing walls to be reconstructed in new locations. Remove all vinyl wall base throughout. 5. Remove all existing suspended acoustical tile ceiling systems throughout. 6. Remove all miscellaneous items left by the User. 7. Construction of new interior concrete floor slab infill. Provide flush transition with existing concrete to remain and slopes as indicted. 8. Construction of interior improvements including relocated partitions in the existing male and female toilet/shower and changing rooms with new fixtures and finishes including new suspended acoustical tile ceilings.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Miscellaneous Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Flush Wood Doors, Windows, Door Hardware, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents