Similar Projects
SH-99 - Utilities
Infrastructure
Design
$950,000 CJ est. value
Seminole, OK 74868

Demolition of 121 North Main Street
Demolition, Renovation, Infrastructure
Design
$150,000 CJ est. value
Seminole, OK 74868

Bridge and Approaches - US270
Infrastructure
Bidding
$4,100,000 CJ est. value
Wewoka, OK 74884

Bridge and Approaches - US270
Infrastructure
Bidding
$4,100,000 CJ est. value
Wewoka, OK 74884

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Remove Existing Light Poles and Lights From 1 (One) Softball Field and Install Light Poles and Lights on 4 (Four) Softball Fields
Infrastructure
Post-Bid
$25,000 CJ est. value
Seminole, OK 74868

Resurface (Asphalt) SH-99A
Infrastructure
Results
OK

Water Treatment Plant Improvements
Renovation, Infrastructure
Results
$15,647,000 CJ est. value
Wewoka, OK 74884

Pavement Rehabilitation - SH 99
Infrastructure
Design
$1,400,000 CJ est. value
Seminole, OK 74868

Martin L.G. 15 Project
Infrastructure
Bidding
$50,000 CJ est. value
Seminole, OK 74868

Install an Irrigation System
Infrastructure
Post-Bid
$585,000 CJ est. value
Seminole, OK 74868

Resurface - SH 59
Infrastructure
Results
$1,542,983 CJ est. value
Seminole, OK 74868

Grade, Drain, Surface, and Bridge - US-270
Infrastructure
Post-Bid
$11,500,000 CJ est. value
Seminole, OK 74868

Resurface - SH 59
Infrastructure
Results
$1,390,883 CJ est. value
Seminole, OK 74868

Grade, Drain, Surface, and Bridge - US-270
Infrastructure
Post-Bid
$30,000,000 CJ est. value
Seminole, OK 74868

Last Updated 07/12/2023 11:31 PM
Project Title

Right of Way - SH056

Physical Address View project details and contacts
City, State (County) Seminole, OK 74868   (Seminole County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2027 , Construction documents
Bids Due View project details and contacts
Estimated Value $3,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-56: From the Junction of Sh-99, East 15.3 Miles - Rw for 36213(04) & 36213(05) As of July 13, 2023, the project is in Final Planning status. Anticipated letting year is 2027. Length : 15.300 Mi OKDOT - Right of Way - SH056 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents