Similar Projects
2022 Alley Grading and Stabilization
Infrastructure, Alteration
Bidding
Englewood, CO 34223

Erosion Control and Stormwater Management Contractor
Infrastructure
Post-Bid
Aurora, CO

Canyons Filing 2, 1st Amendment Lot Development Construction Project
Infrastructure
Post-Bid
Centennial, CO

BAFB Enclave Erosion Control
Results
Less than $400,000 est. value
Greenwood Village, CO 80112

Veterans Memorial Cemetery - Stream and Pond
Results
Less than $800,000 est. value
Greenwood Village, CO 80112

Pond 331 Recharge
Infrastructure
Post-Bid
Greenwood Village, CO 80112

Greenwood Gulch Undercrossing Improvements
Results
Greenwood Village, CO

Construction of the Filing 10, Filing 11, and Fultendale St. Roadways
Infrastructure
Post-Bid
Aurora, CO 80040

Englewood Service Center Drainage and Parking Lot Improvements
Results
Less than $500,000 est. value
Englewood, CO

Goldsmith Gulch Final Phase Improvements - Huntington-Caley Open Space
New Construction, Infrastructure, Alteration
Post-Bid
Greenwood Village, CO 80111

Belleview-Clarkson Drainage Improvements
Results
Greenwood Village, CO

2021 Sanitary Sewer Cipp Rehabilitation Project
Results
Greenwood Village, CO

Design Services for Cherry Creek Reservoir Shoreline Stabilization ESS and Tl PRFS
Results
CO

Retaining Wall Installation Project
Results
Less than $100,000 est. value
CO

Crossroads Overlot Grading
Results
Greenwood Village, CO

Last Updated 02/14/2022 05:34 PM
Project Title

Transport ISP-2 Grading & Erosion Control

Physical Address View project details and contacts
City, State (County) Centennial, CO   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be performed, including all materials and labor necessary for completion of the Work, is: ISP-2 Grading & Erosion Control which includes, but is not limited to, the grading and erosion control for the (i) to be built roads and utilities and (ii) grading of the main drainage channel, all within the seven hundred fifty (750) acre area within Phase 1 of the Port Colorado development. The project is located in the City of Aurora at Manila Road and E. Colfax Road. The successful bidder will manage and coordinate all construction and construction related activities for this project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents