Similar Projects
Septic System Replacement Including New Septic Tanks, Dosing Tanks, and Pressure-dosed Mound Disposal System at the Topinabee Rest Area on I-75
Infrastructure
Bidding
$1,000,000 CJ est. value
Cheboygan, MI 49721

Septic System Replacement Including New Septic Tanks, Dosing Tanks, and Pressure-dosed Mound Disposal System at the Topinabee Rest Area on I-75
Infrastructure
Bidding
$1,000,000 CJ est. value
Cheboygan, MI 49721

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Trowbridge Farms Subdivision Gravel Road Chip Seal
Infrastructure
Post-Bid
$500,000 CJ est. value
Trowbridge, MI 49799

Water Systems Improvements Division A - Elevated Storage Tank
Infrastructure
Results
$1,816,300 CJ est. value
Cheboygan, MI 49721

Water Systems Improvements Division A - Elevated Storage Tank
Infrastructure
Results
$1,816,300 CJ est. value
Cheboygan, MI 49721

Orion Cheboygan Renewable Energy Solar Farm
New Construction, Infrastructure
Pending Verification
$90,000,000 CJ est. value
Cheboygan, MI 49721

Inverness Oaks Condominium
New Construction, Infrastructure
Pending Verification
$4,080,000 CJ est. value
Cheboygan, MI 49721

Wolverine Community Schools Bid Package #1 - 2022 Bond Projects Elementary School & High School Renovations
Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Wolverine, MI 49799

Water Systems Improvements Division B - Mill Street Water Main
Infrastructure
Results
$757,621 CJ est. value
Cheboygan, MI 49721

Hot Mix Asphalt Reconstruction, Concrete Box Culvert Replacement, Drainage, Sanitary Sewer, Signing and Pavement Markings on US-23
Infrastructure
Post-Bid
$15,746,188 CJ est. value
Cheboygan, MI 49721

Water System Improvements Division C - Well Improvements
Infrastructure
Results
$1,779,768 CJ est. value
Cheboygan, MI 49721

I-75 Bridge Approaches
Demolition, New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Indian River, MI 49749

Water Systems Improvements Division D - Elevated Storage Tank Rehabilitation
Renovation, Infrastructure
Results
$510,100 CJ est. value
Cheboygan, MI 49721

Last Updated 03/24/2023 04:09 PM
Project Title

Straits of Mackinac Tunnel Construction - Great Lakes 5 Pipeline Replacement

Physical Address View project details and contacts
City, State (County) Mackinaw City, MI 49701   (Cheboygan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Construction start expected April 2025
Bids Due View project details and contacts
Estimated Value $500,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 24, 2023, the project's permit application is under review from the U.S. Army Corps of Engineers. The project received approval from the State of Michigan's Mackinac Straits Corridor Authority to begin seeking proposals from general contractors. The owner is in the process of developing an RFP. A release date for the RFP has not been determined. Construction is not anticipated prior to 2025. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents