Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Place Polyester Concrete Overlay
Infrastructure
Bidding
$16,500,000 est. value
Sausalito, CA 94965

Rowland Boulevard Improvements
Infrastructure
Bidding
$1,200,000 est. value
Novato, CA 94945

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

CA NPS 2021(1), Pavement Preservation Bay Area
Term Contract
Post-Bid
$2,000,000 to $3,000,000 est. value
Danville, Martinez, Mill Valley, San Francisco, CA 94526

East Blithedale Rehabilitation Project - Phase I
Alteration
Results
$3,000,000 est. value
Mill Valley, CA

Downtown Rehabilitation Project - Phase II
Alteration
Results
$600,000 to $800,000 est. value
Mill Valley, CA

Safe Pathways to School, Nevada Street Traffic Calming Project
Infrastructure
Bidding
$240,000 to $285,000 est. value
Sausalito, CA 94965

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

2021 Northern Region Road Rehabilitation: Phase 2
Infrastructure
Results
$650,000 est. value
CA

Remove and Replace Bike Path Asphalt and Repaint Existing Bike Path Lines, Arrows and Symbols
Term Contract
Post-Bid
Corte Madera, CA 94925

2021 Redwood Highway Frontage Road Pavement Repair Phase 1
Infrastructure
Results
$350,000 est. value
Mill Valley, CA 94941

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Post-Bid
$4,163,870 est. value

2021 Road Sealant, Phase 2
Infrastructure
Results
CA

Last Updated 05/18/2022 01:36 AM
Project Title

2022 Road Sealant Project - Phase 1

Physical Address View project details and contacts
City, State (County) CA   (Marin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements for the 2022 Road Sealant Project: Phase 1 consists of crack sealing, striping removal, slurry seal, microsurfacing, and traffic marking and striping. Project areas include Lucas Valley, Marinwood, Santa Venetia, Greenbrae, Kentfield, Strawberry, Tamalpais, Hicks Valley, Nicasio, Point Reyes, San Geronimo Valley and San Rafael.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents