Similar Projects
Chandler (1300 Block) Reconstruction - 107.24.02 - City of Danville
Infrastructure
Conception
$400,000 CJ est. value
Danville, IL 61832

Rebuild Downtown and Mainstreets Project - 107.24.03 - City of Danville
Infrastructure
Conception
$3,000,000 CJ est. value
Danville, IL 61832

Z1DA--Project 550-24-201 Replace Campus Sidewalk CON
Infrastructure
Bidding
$1,000,000 CJ est. value
Danville, IL 61834

Market Street Water Main Replacement
Infrastructure
Bidding
$400,000 CJ est. value
Hoopeston, IL 60942

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Construct Parking Lot/Street Lighting GH Area at Illiana VA - Rebid
Infrastructure, Renovation
Post-Bid
$745,000 CJ est. value
Danville, IL 61832

Bridge Repairs to SN 092-9903 and Removal of SN 092-9904 at Kickapoo State Park
Infrastructure
Results
$1,473,747 CJ est. value
Oakwood, IL 61858

Lakeside Drive, Eastgate Drive, and Woodland Trace Pump Station Improvements
Demolition, Infrastructure, Renovation
Results
$980,386 CJ est. value
Danville, IL 61832

Concrete Pad with Downspout/ Drainage Tile Work
Infrastructure
Construction
$70,000 CJ est. value
Bismarck, IL 61814

Poland Road Sewer Relocations - 402.24.04 - City of Danville
Infrastructure
Conception
$500,000 CJ est. value
Danville, IL 61834

Cold Storage Asphalt Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Danville, IL 61834

Standard Overlay, Cold Milling,Guardrail, Culvert Replacement, ADA Improvements
Infrastructure
Results
$6,915,403 CJ est. value
Danville, IL 61832

5th Street Pump Station Elimination - 402.24.05 - City of Danville
Renovation, Infrastructure
Conception
$1,000,000 CJ est. value
Danville, IL 61832

Wastewater Treatment Plant Controls Building Rehabilitation
Infrastructure, Renovation
Post-Bid
$130,000 CJ est. value
Rossville, IL 60963

Bridge Replacement and Bridge Deck Overlay
Demolition, New Construction, Infrastructure
Results
$10,240,000 CJ est. value
Batestown, IL 61832

Last Updated 01/03/2024 07:34 AM
Project Title

2022 High School Bleachers and Press Box

Physical Address View project details and contacts
City, State (County) Hoopeston, IL 60942   (Vermilion County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $492,595 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Hoopeston Area Community Unit School District #11, Hoopeston, Illinois will receive bids for the project captioned below. Bid should be dearly marked and sent or delivered to the School District Office located at 615 Orange Street, Hoopeston, IL 60942 for: 2022 H.S. Bleachers and Press Box Hoopeston Area CUSD #11 815 Orange Street Hoopeston, Vermilion County, Illinois. The project consists of new Bleachers and Press Box at the Hoopeston HE rootball Field bleacher site. The owner will handle demolition and concrete work. Prevailing wages in accordance with Vermillion County is required. Bid security is required, in the form of a bid bond or certified check in an amount equal to ten percent (10%) of the base bid as guarantee that the bid will not be withdrawn within 3Q days after the date of opening of bids, and tnat the successful bidder will enter into a Contract for the work awarded to them. Bid security shall be made payable to Hoopeston Area CUSD #11. Bonds are required: Both a Performance Bond and a Labor and Payment Bond are required for this project, each in an amount equal to 100% of the contract price. Your Bid will be required to be submitted under a condition of irrevocability for a period of 30 days after submission. The Owner reserves the right to accept or reject any or all Bids or any part thereof, to waive any informality in bidding, and to accept bids deemed most favorable to the owner. Award of a contract is anticipated to occur on or after the September 15, 2022 meeting of the Board of Education Begin construction as soon as September 16, 2022. The Work shall be Substantially Complete on or before July 28th, 2023 with final completion on or before August 4.2023. There will be a i-k>n- fee to download; the non-refundable fee for hard copies will vary depending on size of plans and specs. You will be able to view full sets before purchasina. All official notifications, meeting minutes, addenda, if any, and other Bidding Documents will be offered only through website. Bid documents should be available on the Plan Room by August 30th. Hoopeston Area Community Unit School District #11 Robert Richardson, Superintendent Email: richarre(R) hoopeston.k12.il.us Phone: 217-283-6661

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents