Similar Projects
RFI 20-082 MM Automated Traffic Management System (ATMS)
Post-Bid

RFI 20-082 MM Automated Traffic Management System (ATMS)
Post-Bid

Replacement of Traffic Signal Cabinets, Traffic Signal Controllers, and Installation of Advanced Detection at Various Locations in Region 1
Results
$1,000,000 to $5,000,000 est. value

Replacement of Traffic Signal Cabinets, Traffic Signal Controllers, and Installation of Advanced Detection at Various Locations in Region 1
Results
$1,000,000 to $5,000,000 est. value

144th & Sable Traffic Signal
Post-Bid
CO

Replacing 5 Existing Signals Along Us 24 And Sh 16 Corridors
Results
$1,000,000 to $5,000,000 est. value
CO

Crooked Stick Traffic Signal And Widening Project
Post-Bid
Lone Tree, CO

State Highway 340 Auxiliary Left Turn Lane At Colonial Drive Project
Results
Less than $431,083 est. value
Grand Junction, CO

Porteos Filing No. 3, 64Th Avenue (South Side) At Jackson Gap Street Streetlights & Porteos No. 2, 56Th Avenue And Powhaton Road Streetlights
Post-Bid
Greenwood Village, CO

Removal of Existing Traffic Signal Backplates and Signal Head Visors, and Furnish and Install New Signal Head Backplatesand Visors Across Region 4
Results
$1,000,000 to $5,000,000 est. value

35th Avenue and 34th Street Traffic Signal
Post-Bid
Evans, CO 80620

Signalizing the on/off Ramps at I25 Erie Parkway
Results
Less than $1,000,000 est. value
CO

Traffic Signal Poles and Mast Arms
Post-Bid
Castle Rock, CO 80104

Sheridan Boulevard Fiber Interconnect
Results
$500,000 to $600,000 est. value
Broomfield, CO

Traffic Signal Materials and Installation
Post-Bid
Boulder, CO 80304

Last Updated 12/20/2019 09:37 AM
Project Title

Chambers Road – Grassland Drive Traffic Signal

Physical Address View project details and contacts
City, State (County) Parker, CO   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 to $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a mast arm traffic signal a Chambers Road and Grassland Drive intersection. Work also includes but not limited to pavement markings and traffic control.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents