Similar Projects
Dickenson Waterline Replacement Project
Infrastructure
Bidding
$600,000 CJ est. value
Globe, AZ 85501

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Guardrail Improvements and Shoulder Widening
Results
$5,400,000 est. value
Pine, AZ 85544

Mesa Del Caballo Paving Project
Results
$490,000 to $550,000 est. value
Globe, AZ

Bridge - Gila County
New Construction, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Globe, AZ 85501

Bridge - Gila County
New Construction, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Globe, AZ 85501

Green Valley Park ADA Site Improvements
Post-Bid
Payson, AZ

GAOA Construction: Roosevelt Pavement Preservation
Term Contract
Results
Roosevelt, AZ 85545

Asphalt Repair and Re-Pavement Materials and Services
Term Contract
Post-Bid
Buckeye, Douglas, Florence, Globe, Goodyear, Phoenix, Safford, Saint Johns, Somerton, Tucson, Winslow, AZ 85607

Construct Fsr 4 Road Project - Tonto National Forest
Infrastructure
Results
$100,000 to $250,000 est. value
Rio Verde, AZ 85263

Z--MATOC - IMR Bridges
New Construction
Post-Bid
$10,000,000 est. value

Horsethief Basin Roads Maintenance - Prescott National Forest
Term Contract
Results
Prescott, AZ 86301

Upper Pinal Creek Bridge and Roadway Alternatives
Renovation, Infrastructure
Post-Bid
Globe, AZ 85501

Construction of Route 6 (Cutter Road) Segment C4 IRR Road Project
Infrastructure
Results
$8,894,707 est. value
San Carlos, AZ

Last Updated 08/03/2022 02:03 PM
Project Title

Tonto Creek Bridge - Arizona Department of Transportation

Physical Address View project details and contacts
City, State (County) San Carlos, AZ 85550   (Gila County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A more detailed scope is expected to be released on a future date. As of September 8 2021 this project is still waiting, it this project is in working drawings complete and should start in spring of 2022. this will be done by the state.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents