Similar Projects
Portable Toilets Services
Term Contract
Sub-Bidding
Superior, WI 54880

Tree Removal
Term Contract
Sub-Bidding
Madison, WI 53715

Floor And Carpet Care Machines And Repair Services
Term Contract
Post-Bid
Madison, WI 53787

Portable Restrooms, Holding Tanks, and Related Items
Term Contract
Post-Bid
West Allis, WI

Courthouse Descent System Anchorage
Alteration
Results
Madison, WI 53703

Construction at Tomahawk Regional & Price County Airports
Infrastructure
Results
$224,302 CJ est. value
Tomahawk, WI 54487

Municipal Building Cleaning Service
Term Contract
Sub-Bidding
Black Earth, WI 53515

Live Steam Leak Repair Services(Uw-Mad)[22-5111]
Term Contract
Post-Bid
Madison, WI

Gravel Bids
Term Contract
Sub-Bidding
Gays Mills, WI 54631

On-Call Diggers Hotline Assessment And Field Marking
Term Contract
Post-Bid
Milwaukee, WI

2023 Recycled Aggregates Crushing Contract
Term Contract
Sub-Bidding
Twin Lakes, WI 53181

Pest Control Services
Term Contract
Post-Bid
Milwaukee, WI 53211

2023 Crushed Aggregate Materials Supply Contract
Term Contract
Sub-Bidding
Bristol, WI 53104

Four-Fold Garage Door
Term Contract
Post-Bid
Madison, WI

2023 Kenosha County Hot Mix Asphalt Materials Supply Contract
Term Contract
Sub-Bidding
Bristol, WI 53104

Last Updated 01/18/2023 07:07 PM
Project Title

Tree Cutting

Physical Address View project details and contacts
City, State (County) Luxemburg, WI 54217   (Kewaunee County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Red River is requesting bids for tree cutting and removal in town ditches. Bids shall include hourly rate including labor and needed equipment. Work will include cutting and removal of trees with 6 inch diameter and larger from right of way to right of way. Stumps will be cut as low to ground as possible and sprayed/killed. Town will be notified as each road is completed. Applicants must be licensed and insured. Work will be done in the Northeast quadrant of the town. Roads included for this year are as follows: o Town Hall from AB to Boucher Rd o Abitz Ln o Barret Dock (WE energies/ man basket -power lines) o Borley Ln o Rocky Ave South of Cty X 1 block on West side o Rocky Ave. north of Cty X 1 block both sides (power lines) o Vandertie Ln East of Rocky 1 Cottonwood South side o Kewaunee/ Door County Line Rd top of hill between 57 and AB o Macco Rd between Bayview Rd and Terrace Ln Board Meeting Please contact Supervisor SteveLeGrave @ 920-493-0070 with questions

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents