Similar Projects
Structure 332 Steel Girder , Gravity Large Concrete Block Wall
Infrastructure
Bidding
SD

Asphalt Surface Treatment
Infrastructure
Bidding

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Concrete Pavement Restoration and Joint Re-Seal
Infrastructure
Post-Bid
Brandon, SD 57005

Veterans Parkway Improvements
Results
Less than $1,862,212 est. value
Sioux Falls, SD

33rd Street and Minnesota Avenue Intersection Reconstruction, Utility Improvements, Pavement Repairs and ADA Improvements
Results
Less than $1,760,000 est. value
Sioux Falls, SD

Buffalo Lake Healthcare Center
Alteration
Post-Bid
Sioux Falls, SD 57105

Interchange Improvements - I-90 and Marion Road
Results
Less than $724,000 est. value
Sioux Falls, SD

Louise Avenue and 74th Street and 69th Street and Ralph Rogers Road Intersection Improvements
Infrastructure
Post-Bid
$775,875 est. value
Sioux Falls, SD 57107

69th Street and Sycamore Avenue Improvements
Results
$3,275,503 est. value
Sioux Falls, SD 57108

Minnesota Avenue Reconstruction Phase 1 - Russell Street to 2nd Street
Infrastructure
Post-Bid
$12,716,000 est. value
Sioux Falls, SD 57104

Marion Road Improvements, 41st Street to 57th Street
Results
Less than $895,092 est. value
Sioux Falls, SD 57100

Rushmore Area Reconstruction - Phase I
Results
$5,300,000 est. value
Brandon, SD

Phillips Avenue Improvements - 14th Street to 18th Street
Results
$1,327,780 est. value
Sioux Falls, SD

Downtown Area Street and Utility Reconstruction - 2021 Downtown Streetscape Maintenance
Results
Less than $141,428 est. value
Sioux Falls, SD

Reported 12/17/2021 12:00 AM
Project Title

Highway 149 Reconstruction

Physical Address View project details and contacts
City, State (County) SD   (Minnehaha County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $4,250,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of reconstructing 5.3 miles of County Highway 149 beginning at 254th Street and ending near Colton, South Dakota. The project generally includes salvaging the existing highway surfacing, grading, installing pipe culverts and drainage structures, placing interim surfacing, and installing erosion control measures and miscellaneous related items

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents