Similar Projects
Asbestos Abatement Contract FPB#2
Term Contract
Sub-Bidding
$200,000 CJ est. value
Clemson, SC 29631

RWDC Demolition and Abatement Revolutionary War Discovery Center
Term Contract, Demolition, Infrastructure
Sub-Bidding
$40,000 CJ est. value
Gaffney, SC 29340

Electronic Waste Disposal
Term Contract
Post-Bid
Aiken, SC 29801

Asbestos Abatement, Demolition, and Disposal of 06 Regulated Structures from Sites within City (City-CDBG)
Demolition, Alteration
Post-Bid
North Charleston, SC

Asbestos Abatement
Infrastructure, Alteration
Results
Columbia, SC 29212

Asbestos Abatement and Demolition Services
Demolition, Alteration
Results
SC 29506

Interior and Exterior Signage for Tri-County Technical College
Infrastructure
Construction
$76,853 CJ est. value
Pendleton, SC 29670

Dorchester Commerce Center Bldg 2
New Construction, Infrastructure - 533,280 SF
Pending Verification
$57,000,000 CJ est. value
Summerville, SC 29483

Demolition and Abatement Services
Term Contract, Demolition, Infrastructure
Sub-Bidding
Columbia, SC 29206

College Lodge Abatement and HVAC Preparations - Phase II - Abatement
Alteration
Post-Bid
Less than $500,000 est. value
SC 29424

Olmsted Park Asbestos Abatement And Demolition Project
Demolition, Alteration
Results
North Charleston, SC

I-20/I-126/I-26 Corridor Improvements - Structure Demolition Package C
Demolition, Infrastructure
Sub-Bidding
$203,000 CJ est. value
Columbia, SC 29210

Demolition of Old Central School
Demolition, Infrastructure
Post-Bid
$170,000 to $230,000 est. value
Greenwood, SC 29646

Asbestos Abatement and Building Demolition
Demolition, Alteration
Results
Myrtle Beach, SC 29577

Hanahan Steward Street Park
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Hanahan, SC 29410

Last Updated 06/21/2023 10:21 AM
Project Title

Whitmire Building Demolition

Physical Address View project details and contacts
City, State (County) Whitmire, SC 29178   (Newberry County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $9,200 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 21, 2023, the project has not been awarded. A timeline for award has not been confirmed. Whitmire Building Demolition The County of Newberry is seeking contractors for the demolition of a wood framed structure in Whitmire, SC. Newberry County TMS #314-1-4-4, is located at the corner of Gilliam Street and Setzler Alley in Whitmire. All work shall conform to Newberry County and SCDEC regulations pertaining to demolition work The scope of work will be to demolish and haul off the vacant building as shown on the TMS map # 314-1-4-4. The building is a wood framed structure, wood-sided, with brick veneer. The wood flooring is on raised pillars The demolition will be for the walls, supports and roof. The existing concrete slab will remain. Care shall be taken to ensure the existing slab is not damaged. There is an interface with the brick building to the existing garage building that is part of TMS # 314-1-4-4. The intent is to remove the brick veneer from the block wall of the existing garage structure. The block wall for the garage is to be left intact. The support columns for the garage wall are to remain in place. The roof flashing and roof insulation will be straight cut at the interface to leave the flat roof of the garage intact as much as possible. The structural steel supports shall be removed by cutting flush with floor elevation or removed and refilled with 3,000 psi grout or concrete. The site will be smooth graded to the existing adjacent street contours The removal area will be fenced off for safety and to prevent public access. Orange barricade fencing or chain link fencing, properly supported may be used for the barricade. Proper traffic control, including signage will be put in place to prevent interface between demolition work and the daily public traffic. The entire area will be cleaned of all demolished material. The safety fencing may remain in place.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents