Similar Projects
Central HS Combes Gym
Renovation
Bidding
Champaign, IL 61820

2021 General Remodeling at Lockport Township High School
Renovation
Bidding
Lockport, IL 60441

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Fitness Addition - East Building Addition Phase II
Addition - 89,000 SF
Post-Bid
Lincolnshire, IL 60069

East Building Addition Phase II & Field House Expansion
Renovation, Addition - 119,000 SF
Results
Lincolnshire, IL 60069

Orozco School Environmental Abatement
Renovation
Results
Chicago, IL 60608

Robinson Health-Life Safety Improvements
Renovation
Bidding
Robinson, IL 62454

2021 Summer Work
Renovation, Addition
Post-Bid
Winnetka, IL 60093

Disaster Recovery Services
Results

High School Gym Replacement at Argenta-Oreana High School
Addition - 16,187 SF
Bidding
Less than $4,200,000 est. value
Argenta, IL 62501

Summer 2021 Improvements at Palombi MS
Post-Bid
Lake Villa, IL

Disney II Magnet HS Convent Building Tuckpointing
Results
Chicago, IL 60602

Joseph Sears School Summer Bid Package 1
Renovation
Bidding
Kenilworth, IL 60043

2021 Capital Improvements
Post-Bid
Carol Stream, IL 60188

Accessibility and Miscellaneous Work at Mille Proegler School
Results
Kankakee, IL 60901

Last Updated 02/05/2021 04:48 PM
Project Title

Locker Room and Toilet Renovations - Collinsville High School

Physical Address View project details and contacts
City, State (County) Collinsville, IL 62234 (Madison, Saint Clair Counties)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Toilet/Shower facility renovations, flooring replacement, and locker replacement to the girls's PE locker room.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents