Similar Projects
Derek Apartments Phase 1
New Construction, Infrastructure - 400,000 SF
Design
$10,000,000 CJ est. value
Spokane Valley, WA 99206

Sprague/barker Intersection Improvement Project
Infrastructure
Bidding
$600,000 est. value
Spokane Valley, WA 99016

Sprague/barker Intersection Improvement Project
Infrastructure
Bidding
$600,000 est. value
Spokane Valley, WA 99016

Hatch Road Bridge Deck Replacement
Infrastructure
Post-Bid
$1,800,000 to $2,200,000 est. value
Spokane, WA

Bigelow Gulch Road Project Six
Alteration
Post-Bid
Spokane, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Sundance III Force Main Replacement
Infrastructure
Bidding
$450,000 to $525,000 est. value
Spokane, WA

Pedestrian Ramp Replacement
Infrastructure
Post-Bid
Deer Park, WA

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Evergreen Road Preservation
Infrastructure
Post-Bid
Spokane Valley, WA

2022 Eastern Region Chip Seal - South
Infrastructure
Results
$7,000,000 to $10,000,000 est. value

Spokane Airport Board Unit Price Airside Pavement Rehabilitation
Term Contract
Post-Bid
Spokane, WA 99224

Service Change Bus Stops Phase 1
Infrastructure
Results
Airway Heights, Liberty Lake, Spokane, Spokane Valley, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Last Updated 05/18/2022 12:49 AM
Project Title

North Spokane Corridor - Wellesley Avenue Phase 2 (Haven Street to Market Street)

Physical Address View project details and contacts
City, State (County) Spokane, WA 99205   (Spokane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,000,000 to $4,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of approximately 6,200 square yards of cement concrete paving, 900 square yards of asphalt paving, 1,400 linear feet of cement concrete curb, 1,800 square yards of cement concrete sidewalks and driveways, 1,300 linear feet of storm sewer, drainage structures, 1,200 linear feet of water main, 50 linear feet of sanitary sewer main, a new traffic signal, a traffic signal retrofit, communication conduit, traffic control, and other related items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents