Similar Projects
Google Middlefield Park Master Plan
New Construction - 3,455,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA

Victoria Hotel
New Construction, Demolition - 69,680 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
San Jose, CA 95126

Platform 16 Office Complex
New Construction - 1,125,000 SF
Design
$10,000,000 CJ est. value
San Jose, CA

Lifetime Fitness
New Construction - 913,700 SF
Design
$10,000,000 CJ est. value
San Jose, CA 95117

Multi-Tenant Kitchen
Renovation - 16,182 SF
Post-Bid
San Jose, CA 95113

South Loop Project
Infrastructure
Post-Bid
Santa Clara, CA 95134

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

CityView Office Campus Mixed-Use
New Construction, Demolition - 3,640,000 SF
Construction
San Jose, CA 95113

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Eterna Tower
New Construction, Infrastructure - 1,500 SF
Pending Verification
$37,000,000 CJ est. value
San Jose, CA 95113

Empire Lumber Housing Development
New Construction, Demolition - 66,300 SF
Pending Verification
San Jose, CA 95116

Vallco Town Center Commercial Residential Mixed Use Reuse Development
New Construction, Renovation, Build-Out, Demolition, Alteration
Conception
$3,000,000,000 est. value
Cupertino, CA 95014

Garden Gate Tower
New Construction - 381,470 SF
Design
$10,000,000 CJ est. value
San Jose, CA 95113

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Last Updated 10/03/2022 04:04 PM
Project Title

South Winchester Boulevard Hotel

Physical Address View project details and contacts
City, State (County) San Jose, CA 95128   (Santa Clara County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Food/Beverage Service, Hotel/Motel, Parking Garage, Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $36,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a hotel. A hotel brand has not yet been selected. As of October 3, 2022, this project has not submitted applications for building permits. It has received approval from the San Jose Planning Department. An architect has been selected; however, a general contractor or selection method has not been disclosed. A firm construction timeline has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

6 Stories Above Grade, 118,528 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents