Similar Projects
DMDF Vertical Expansion
Term Contract
Design
Chicago, IL 60617

Roadway Drainage - Landscape Improvements - Bridge Modifications
Renovation, Infrastructure
Bidding
$200,000 est. value
Thornton, IL

Riprap Placement, Guardrail Removal and Replacement, Expansion Joint Replacement
Infrastructure
Bidding
$500,000 est. value
Sycamore, IL 60178

Drinking Water Reservoir Cleaning and Inspections
Term Contract
Post-Bid
Oak Park, IL

FY 2021 Culvert
Post-Bid
IL

Roadway Reconstruction, Box Culvert Replacement, and Constructon of a Soldier Pile Retaining Wall under the I-294 Bridge
Results
Franklin Park, IL

Insertion Culvert Liners on IL 99 and IL 107 from the Pike County Line to the Schuyler County Line
Results
IL

Improvement at the IDOT I-57 Maintenance Yard
Infrastructure
Bidding
$300,000 est. value
Country Club Hills, IL 60478

Retaining Wall
Term Contract
Post-Bid
Darien, IL

West Bartlett Drainage Improvements
Results
Bartlett, IL

Culvert Repair
Infrastructure
Bidding
$750,000 est. value
Willow Springs, IL 60480

2021 Clow Creek Shoreline Restoration
Post-Bid
Naperville, IL

RR-20-4554 Box Culvert Construction Tri-State Tollway I-294 Ogden Avenue to Cermak Road
Results
Downers Grove, IL

Construction of a Shared-use Path, Includes a Reinforced Slope System, Drainage Improvements, Culvert Headwall Modifications, Guardrail Installation and Pavement Markings
Infrastructure
Bidding
$4,000,000 est. value
Palos Park, IL 60464

Drain Replacement And Ditch Reconstruction
Post-Bid
Urbana, IL

Last Updated 05/25/2022 12:37 AM
Project Title

County Highway 12

Physical Address View project details and contacts
City, State (County) Earlville, IL 60518   (La Salle County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $287,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of the removal and replacement of the 3 existing CMP Pipe Culverts (24") installing a Precast Concrete Box Culvert 6'x3', cast-in-place concrete end sections and other related work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents