Similar Projects
Multidisciplinary Research/Informatics Science Building IV - IU School of Medicine
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Bloomington, IN 47405

3000 and 3070 S Walnut St Warehouse / Bloomington
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Bloomington, IN 47401

3000 and 3070 S Walnut St Warehouse / Bloomington
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Bloomington, IN 47401

Templeton Elementary School Playground
Infrastructure
Bidding
$500,000 CJ est. value
Unionville, IN 47468

Miller Showers Dredging And Disposal
Infrastructure
Bidding
$4,000,000 CJ est. value
Bloomington, IN 47404

Trades District Technology Center
LEED Certification, New Construction, Infrastructure - 22,233 SF
Post-Bid
$7,000,000 CJ est. value
Bloomington, IN 47404

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

BL009 Poplars Parking Garage - Seal Coating-Repairs
Infrastructure
Results
Bloomington, IN 47408

SE000A Site - Campus Sidewalks - Central Campus
Infrastructure
Results
$309,400 CJ est. value
Bloomington, IN 47405

Indianapolis Academic Health Center Medical Education and Research Facility
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Indianapolis, IN 46202

The Retreat at Swithchyard Park
New Construction, Infrastructure - 3,000 SF
Construction
$24,000,000 CJ est. value
Bloomington, IN 47401

2nd Street Commercial Addition
Addition, Demolition, Infrastructure, Renovation - 17,690 SF
Pending Verification
$3,500,000 CJ est. value
Bloomington, IN 47401

2nd Street Commercial Addition
Addition, Demolition, Infrastructure, Renovation - 17,690 SF
Pending Verification
$3,500,000 CJ est. value
Bloomington, IN 47401

East Kirkwood Avenue Multi-Residential Development / Bloomington
New Construction, Infrastructure
Design
$9,430,000 CJ est. value
Bloomington, IN 47408

Bike and Pedestrian Facilities
Infrastructure
Bidding
$2,000,000 CJ est. value
Bloomington, IN 47408

Last Updated 01/08/2024 01:35 AM
Project Title

New Road Construction and New Bridge Construction - Fullerton Pike

Physical Address View project details and contacts
City, State (County) Bloomington, IN 47403   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $15,409,000 [brand] Estimate
Plans Available from Landscape Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Project Control No. 1802977, 2001721 Federal/State No. 1802977, 2001721 New Road Construction Monroe County - on Fullerton Pike From West Gordon Pike to Rockport Road New Bridge Construction 53-00315 Continuous Prestressed Concrete Tee Beam Monroe County - on Fullerton Pk Ov W Fk Clear Creek, 0.5 Mi E of Rockport Rd Qualifications: B(A) C(B) D(B) Contractors desiring to submit electronic bids via Electronically must register with INDOT as a valid bidder by submitting the form provided on the INDOT Letting Information internet page. Failure to register will cause failure of the Electronic bid submission process. A bidder may request valid bidder status by submitting the bidder registration form until 9:00 AM on the bid opening date. An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids. INDOT - Call 145 - New Road Construction and New Bridge Construction - Fullerton Pike

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents