Similar Projects
Replace Oak Bottom Law Enforcement Operations Building
New Construction
Bidding
$1,000,000 to $5,000,000 est. value
Whiskeytown, CA 96095

CHP Capistrano Roof Maintenance
Renovation, Alteration
Bidding
San Juan Capistrano, CA 92675

ACSO Tactical Training Tower Installation
Infrastructure
Post-Bid
Less than $230,000 est. value
Dublin, CA 94568

Transportation Security and Operations Center (TSOC)
New Construction - 30,000 SF
Design
$38,000,000 est. value
Anaheim, CA 92808

CHP Oceanside Elevator Maintenance
Alteration
Bidding
Vista, CA 92081

CHP Santa Ana Roof Maintenance
Renovation, Alteration
Bidding
Santa Ana, CA 92705

Tenant Improvements At OCFA Fire Stations 14 And 16
Renovation - 2,987 SF
Results
Silverado, CA 92676

CHP Westminster Roof Maintenance
Renovation, Alteration
Bidding
Westminster, CA 92683

Design-Build Construct New Fire Training Tower
New Construction
Post-Bid
$1,000,000 to $5,000,000 est. value
March Air Reserve Base, CA

Riverside County Fire Department Station # 77 - Lake Riverside Expansion Project
New Construction
Results
$1,600,000 est. value
Riverside, CA 92519

Demolition of a Fire Damaged Building
Demolition - 2,772 SF
Results
Lake Elsinore, CA 92530

La Honda Fire Brigade Fire Station 57 Renovation
Renovation
Bidding
La Honda, CA 94020

Facility Repair and Remodel Oroville Police and Fire Department
Renovation
Post-Bid
Oroville, CA 95966

Madera County Fire Station 3
New Construction - 7,985 SF
Bidding
$6,400,000 est. value
Madera, CA 93638

OCFA Fire Station #75 And OCFA Fire Station #79 Fencing
Renovation, Alteration
Bidding
$150,000 est. value
Santa Ana, CA 92701

Reported 10/08/2021 12:00 AM
Project Title

PSAP 911 Command Room Improvements

Physical Address View project details and contacts
City, State (County) Hollister, CA 95023   (San Benito County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $65,000 to $75,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Command Center room improvements, including Door install, hardware, removal of plumbing (eye wash station), wall treatments, All electrical work associated. furnish and install all required in place equipment, Conduits, Conductors, Cables and any miscellaneous materials for the satisfactory interconnection and operation of all association electrical systems.

Details

Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents