Similar Projects
Air Conditioner Preventive Maintenance Services
Term Contract
Bidding
Frisco, CO 80443

Renovated Air Filtration System
Post-Bid
Rifle, CO 81650

Bi-Annual Preventative Maintenance and As-Needed Repair Services for HVAC System
Term Contract
Post-Bid
Aspen, CO 81611

Rifle High School Heater Installation
Results
Rifle, CO 81650

As-Needed HVAC, Mechanical and Plumbing Services
Term Contract
Results
Aspen, CO 81611

Airport Hvac On-Call & Maintenance
Term Contract
Post-Bid
Aspen, CO

Chiller Replacement Aspen Campus
Results
Aspen, CO 81611

As-Needed HVAC Servies
Term Contract
Post-Bid
Glenwood Springs, CO 81601

Ionization Retrofit
Results
Glenwood Springs, CO

HVAC System Preventative Maintenance and As-Needed Repair Services
Term Contract
Post-Bid
Aspen, Basalt, CO 81611

Installation of Boiler at Riverside Middle School
Results
New Castle, CO 81647

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

Specialty HVAC Services
Term Contract
Post-Bid
CO

HVAC and Mechanical Products
Term Contract
Post-Bid

Heat Exchanger Tube Bundles
Post-Bid

Last Updated 12/15/2020 01:16 PM
Project Title

Needlepoint Bipolar Ionization

Physical Address View project details and contacts
City, State (County) Aspen, Breckenridge, Carbondale, Glenwood Springs, Rifle, CO (Garfield, Pitkin, Summit Counties)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified Contractors to furnish all equipment, materials, supplies, labor to install auto-cleaning, needlepoint bipolar ionization equipment. 1. The needlepoint bipolar ionization equipment will be installed in HVAC fan coil units and small furnace units. 2. The needlepoint bipolar equipment must be UL 867 certified and UL 2998 certified. Please include this information in your bid. 3. This project requires needlepoint bipolar ionization equipment sized for 2400 CFM HVAC equipment and 4800 CFM HVAC equipment. 4. A list of the required equipment is below for each location. 5. If the needlepoint bipolar equipment is not design for 24-volt input power (3 phase equipment or 277v single phase equipment), the contractor is responsible for supplying a properly sized transformer for each HVAC equipment. 6. The needlepoint bipolar ionization equipment will require a set of dry contacts (alarm output) that will be wired to the HVAC equipment Building Automation System controller. 7. Detail drawings are attached for wiring to the BAS controllers. 8. Each needlepoint bipolar ionization system must be installed to the manufacture installation, operation and maintenance manual specs.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents