Similar Projects
Sunny Dale Apartments Exterior Renovations
Renovation
Bidding
$430,000 CJ est. value
Burien, WA 98148

Health and Human Services (HHS) Roof Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Longview, WA 98632

Roof Replacement at Woodridge Park Apartments
Renovation
Sub-Bidding
$160,183 CJ est. value
Seattle, WA 98168

Port of Bellingham Re-Roof International Trades Building
Alteration
Post-Bid
$360,000 est. value
Bellingham, WA

Dirtworks Gazebo Roof Replacement project
Alteration
Post-Bid
Olympia, WA

Wallenstien Performing Arts Roof Replacement
Alteration
Results
$375,000 to $480,000 est. value
Moses Lake, WA 98837

Weatherization Residential Insulation 8560
Alteration
Results
WA

Food Service Building: Replace Roof
Renovation - 32,200 SF
Sub-Bidding
$780,000 CJ est. value
Pullman, WA 99163

Roof Replacement at Glenhaven Condominiums
Alteration
Post-Bid
Langley, WA 98260

Weatherization Residential Insulation 8554
Alteration
Results
WA

Whatcom County Courthouse Roof #10 and #22 Reroof
Renovation
Sub-Bidding
$400,000 CJ est. value
Bellingham, WA 98225

Arlington Library Roof Replacement
Alteration
Post-Bid
Arlington, WA 98223

Weatherization Residential Insulation 8580
Alteration
Results
WA

Roofing Installation and Repair Services for Facilities Management
Renovation
Sub-Bidding
$350,000 CJ est. value
Tacoma, WA 98402

Weatherization - URGENT Roof
Alteration
Post-Bid
WA

Last Updated 03/09/2023 11:31 PM
Project Title

FY2022-23 Union High School Phase 2 Partial Roof Replacement

Physical Address View project details and contacts
City, State (County) Camas, WA 98607   (Clark County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,084,957 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor will provide all labor, equipment, materials, project management, and site supervision as required to complete the Union High School Phase 2 Partial Roof Replacement scope of work described in the project drawings and specifications No Bid will be considered unless it is in complete accordance with the instructions to bidders and is submitted upon the official bid form provided to prospective bidders (included in the bid documents). Each bid must be accompanied by bid security in the form of a bid bond for not less than five percent (5%) of the base bid amount, excluding applicable State of Washington taxes. Bid security shall be forfeited as damages should the Bidder neglect or refuse to enter into a contract and provide a suitable bond for performance/payment for labor and materials The Board of Directors of Evergreen Public Schools reserves the right to reject any or all bids or portions thereof and waive any informality or irregularities. The project is estimated to cost $1,340,000. Bids will be opened and read aloud immediately after the bid closing time for their receipt, at which time all interested persons are entitled to attend the bid opening.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents