Similar Projects
CM/GC Hogan Construction Westlake High school Driver`s Ed. Tower
Bidding
American Fork, UT 84045

Maple Grove Middle School
New Construction
Post-Bid
Mapleton, UT 84664

ASD Micron Middle School 435
Post-Bid
Lehi, UT 84043

Franklin Discovery Academy - Construction of New Classroom Addition
Addition
Results
Vineyard, UT

Lakeridge Junior High Science Classroom Remodel
Renovation
Results
Less than $87,000 est. value
Orem, UT 84058

DFCM Construction-Utah Schools for the Deaf and the Blind-New Springville School
Construction
Less than $10,500,000 est. value
Springville, UT 84663

Valley View Middle School
Construction
Salem, UT

American Heritage Phase 1C And 2A
New Construction - 86,128 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
American Fork, UT 84003

Construction Manager/General Contractor Spanish Fork High School Rebuild
Results
Spanish Fork, UT 84660

General Contractor Technology/Curriculum Building
New Construction
Construction
Spanish Fork, UT

Spanish Fork High School Bid Package 1
Post-Bid
Spanish Fork, UT 84660

Mountain View High School Shop Remodel
Renovation
Results
Orem, UT 84057

Mountain Sunrise Academy Charter School
New Construction - 40,096 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Saratoga Springs, UT 84043

CM/GC Westlake Driver`s Education Tower
Post-Bid
Saratoga Springs, UT 84045

Prefabricated Building Construction
Results
Salem, UT 84653

Last Updated 08/21/2019 02:51 PM
Project Title

Eagle Mountain UT SR Seminary

Physical Address View project details and contacts
City, State (County) Eagle Mountain, UT   (Utah County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Complete as of August 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details 1 Middle/Senior High School, 40,811 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents