Project Title | District of Columbia Power Line Undergrounding (DC Plug) Feeder 14008 |
Physical Address | View project details and contacts |
City, State (County) | Washington, DC 20018 (District of Columbia County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Synopsis Work under this Contract consists of the civil construction for PEPCO feeder 14008 of the DC Power Line Undergrounding (DC PLUG) Program, located in Ward 5 and bound by Montana Avenue NE, W Street NE, Brentwood Road NE, and 14th Street NE as shown on the plans and as directed by the Engineer. The scope of work includes, but is not limited to, the following major improvements: a. The removal and disposal of existing roadway pavement, curb, gutter, and sidewalks to the extents shown on plans or as necessary for access to trench excavation. b. The installation of PEPCO supplied materials such as PVC and fiberglass conduits, precast manholes, precast tapholes, precast transformer enclosures, and other related items and components. c. The furnishing and installation of pea gravel concrete for duct bank encasement. d. The furnishing and installation of thermal fill for duct bank encasement at transmission feeder crossings. e. The furnishing and installation of concrete and reinforcing steel for cast-in-place manhole construction. f. Excavation and backfilling of all utility cuts. g. Temporary restoration of all utility cuts. h. Permanent restoration of all utility cuts. i. Restoration of all pavement markings disturbed by the utility cut and pavement restoration work. Upgrade crosswalks to the high visibility type at all intersections within the project limits. j. Pavement profiling (milling) and overlay (approximately 2 inches) of utility cuts and per plan in accordance with DDOT standards. k. Installation of topsoil, seed, and mulch on all disturbed earth and grass areas. l. Installation of replacement curb (in-kind), curb and gutter (in-kind), and sidewalk (in-kind) sections. m. The installation and use of erosion and sediment control measures meeting DDOT/DOEE standards and per plan. n. Dust control during pavement saw cutting and excavation operations. o. Mobilization and demobilization, completion of field layout, provision and maintenance of engineers field facilities, progress photographs, and rodent control. p. Maintain vehicular, bicycle and pedestrian traffic per DDOT Standard Specifications Section 612 and Attachment J.14 (MOT Typical) or as directed by the Engineer. Maintain access to residential, institutional, and commercial establishments using appropriate means as approved by the Engineer. q. Maintain service of all existing utilities during construction. Work also includes all incidentals needed to complete the project as shown on the Contract plans and described in the Specifications and the Technical Specifications or as directed by the Contract Administrator. Subcontracting Requirement 35% Work Site Location located in Ward 5 and bound by Montana Avenue NE, W Street NE, Brentwood Road NE, and 14th Street NE For additional information, if you are interested in responding to this solicitation, please contact the Contracting Officer listed above. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |