Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Harmony Ridge Neighborhood Park
Infrastructure
Design
$300,000 CJ est. value
Windsor, CO 80550

2022 Street Rehabilitation Project
Infrastructure
Bidding
$500,000 CJ est. value
Garden City, CO 80631

WCR 74/33 Intersection Project
Infrastructure
Bidding
$5,300,000 CJ est. value
Lucerne, CO 80631

Grizzly Highpointe / Greeley
New Construction, Infrastructure - 7,780 SF
Sub-Bidding
$2,000,000 CJ est. value
Greeley, CO 80634

State Highway 60 Waterline Replacements
Post-Bid
Johnstown, CO

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

12 Inch Waterline Install and Bore Project
Results
CO

Austin Avenue Water Main
Results
Erie, CO 80516

Fossil Creek Ranch - Filing 1 & 2
Construction
Windsor, CO

Greeley Apartment / HP Site
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Greeley, CO 80634

2022 Bond - Weld RE-4 School District
New Construction, Renovation, Infrastructure
Pending Verification
$271,000,000 CJ est. value
Greeley, CO 80631

Delantero Master Planned Community
New Construction, Infrastructure
Pending Verification
$400,000,000 CJ est. value
Greeley, CO 80631

Parking Lot Pothole Repairs
Infrastructure
Bidding
$300,000 CJ est. value
Greeley, CO 80631

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Last Updated 08/22/2022 09:32 AM
Project Title

The Flaming Gorge Project

Physical Address View project details and contacts
City, State (County) Greeley, CO 80631   (Weld County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,000,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: site work and new construction of a 375 mile buried pipeline system from the Flaming Gorge/Green River System in South West Wyoming through the Interstate 80 Federal Energy Corridor into the Front Range of Colorado. As of August 22 2022, this project is seeking funding. A timeline for construction has not been determined.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents