Similar Projects
SH 09 - Utilities
Infrastructure
Design
$508,453 CJ est. value
Anadarko, OK 73005

Utilities - SH 58
Infrastructure
Design
$600,000 CJ est. value
Carnegie, OK 73015

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Stephenson-Taylor Water Line Extension
Infrastructure
Post-Bid
$250,000 CJ est. value
Binger, OK 73009

Old Caddo County Maintenance Yard UST Removal
Infrastructure
Post-Bid
$166,170 CJ est. value
Anadarko, OK 73005

Slabjacking and Subsealing Services
Infrastructure
Results

Pavement Rehabilitation (Dbr/Diamond Grind) H.E. Bailey Turnpike: from M.P. 62.0 Extend Northeast To M.P. 78.0
Infrastructure
Results

Grade, Drain and Surface - SH 8
Infrastructure
Design
$11,925,000 CJ est. value
Gracemont, OK 73042

Pedestrian Improvements (Sidewalks) - SH-152
Infrastructure
Post-Bid
$374,635 CJ est. value
Binger, OK 73009

Silver Buffalo Casino and Food Distribution Building
Term Contract, Alteration
Results
$500,000 to $1,000,000 est. value
Anadarko, OK 73005

Bridge and Approaches - US 281
Infrastructure
Design
$15,874,343 CJ est. value
Gracemont, OK 73042

Apache Tribe of Oklahoma, Silver Buffalo Casino and Food Distribution Building Parking Lot Project
Alteration
Results
$1,000,000 est. value
Anadarko, OK 73005

Grade, Drain and Surface - US 277
Infrastructure
Design
$13,443,500 CJ est. value
Cyril, OK 73029

Resurface, Bridge Rehabilitation, and Cable Barrier I-40
Infrastructure
Results
$12,998,630 CJ est. value
Hydro, OK 73048

Waterline Replacement
Infrastructure
Results
$933,848 CJ est. value
Fort Cobb, OK 73038

Last Updated 02/15/2023 07:35 AM
Project Title

Intersect Modif

Physical Address View project details and contacts
City, State (County) Binger, OK 73009   (Caddo County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2026
Bids Due View project details and contacts
Estimated Value $2,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-152: Intersection Modification at Jct Sh-58, East and West As of February 15, 2023, the project is in Design status. Anticipated letting month/year is July, 2025. Length : 1.820 Mi. OKDOT - Intersect Modif *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents