Similar Projects
Preventative Maintenance Inspections of Various HVAC Systems
Bidding
Less than $35,000 est. value
Braintree, MA

Renovation and Expansion of Existing Locker Rooms at Ulin Rink - Sub-Bids
Sub-Bidding
Less than $475,000 est. value
Milton, MA

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Annual Burner Services
Term Contract
Post-Bid
Dedham, MA

HVAC Maintenance, Inspections and Repairs for the Bellingham Public Schools
Results
$170,000 est. value
Bellingham, MA 02019

Adams Shore Library HVAC Upgrade - General Bids
Results
$490,000 est. value
Quincy, MA

Senior Center HVAC Reheat Project
Post-Bid
$100,000 est. value
Canton, MA 02021

Replacement of Two Air Existing Air Cooled Chillers at North Quincy High School
Results
$882,000 est. value
Quincy, MA 02169

Wellesley Middle School Dust Collection
Post-Bid
Less than $30,000 est. value
Wellesley, MA 02481

Bathroom Ventilation Upgrade, Julius Rubin Court 667-2
Results
Less than $125,000 est. value
Canton, MA

Ductless Cooling Units
Post-Bid
$148,000 est. value
Westwood, MA

Chiller Replacement at Norwood Memorial Library
Results
$230,000 est. value
Norwood, MA

HVAC/R Services
Term Contract
Post-Bid
Less than $2,000,000 est. value

Energy Management Services
Results
Franklin, MA 02038

HVAC Upgrades at Braintree Town Hall
Post-Bid
Less than $120,000 est. value
Braintree, MA

Last Updated 12/07/2018 08:41 AM
Project Title

Adams Shore Library HVAC UPgrade - Filed Sub Bids

Physical Address View project details and contacts
City, State (County) Quincy, MA   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $490,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description DCAMM Certification Required. The Adams Shore library HVAC systems will be upgraded with a new mechanical systems. The existing boiler, chiller and air handling unit, ductwork and piping will be demolished and disposed o The new HVAC system will include a new air handling unit, terminal devices, hot water boilers, piping and duct work. A new DDC system will be provided for the entire building. A new electrical system will be modified to accommodate a new sub panel, new breakers and new lighting for the mechanical room.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents