Similar Projects
SR 528 Widening from Narcoossee Road To SR 417
Bidding
Orlando, FL

SR 429 Widening from Tilden Road to Florida's Turnpike
Infrastructure
Bidding
Winter Garden, FL 34787

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Concrete and Asphalt Restoration Services
Infrastructure
Post-Bid
Orlando, FL

S.R. 538 Poinciana Parkway Widening from Ronald Reagan Parkway to Cypress Parkway
Results
Orlando, FL 32807

Design Build Push Button Contract No. 2 - Program Management
Results

Buena Vista Drive North - Median Closure
Construction
Orlando, FL 32800

SheltAir FBO Parking Lot Expansion
Addition
Construction
Orlando, FL 32803

Resurfacing - SR 500
Infrastructure
Bidding
$2,117,781 est. value
FL

Cove Drive and Sol Avenue Roadway Improvements Project
Infrastructure
Post-Bid
$492,289 est. value
Belle Isle, FL 32812

SR 417 Widening from International Drive to John Young Parkway
Results
$88,000,000 est. value
Orlando, FL 32807

Intersection Improvement - SR 435
Infrastructure
Bidding
$1,022,481 est. value
FL

Cold In-Place Bituminous Base Recycling with Asphalt Resurfacing
Term Contract
Post-Bid
$13,057,755 est. value
Orlando, FL

West Oakland Avenue and North Cumberland Avenue Reconstruction - Phase 1 and Lakewood Avenue and East Oakland Avenue Construction
Results
Less than $1,600,000 est. value
Ocoee, FL 34761

Asphalt and Sidewalk Rehabilitation
Infrastructure
Bidding

Reported 01/28/2022 08:33 AM
Project Title

SEC Stackout Pad and Warehouse Road Repair

Physical Address View project details and contacts
City, State (County) Orlando, FL   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction modification to the stack-out pad to Luff Street consisting of the following: replacement of all damaged stack-out pad blocks; replacement of the radial arm stacker wall; construction of concrete turning pads on the Luff Street intersections; and construction of a concrete roadway between the east and west concrete turning pads

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents