Similar Projects
RFP Design - Design and Construction of Mckee Run Control House
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Dover, DE 19904

Puncheon Run Transmission Bypass - Kent County
Infrastructure
Conception
$2,600,000 CJ est. value
Dover, DE 19904

NCALL Office Building
New Construction, Infrastructure - 7,920 SF
Design
$1,500,000 CJ est. value
Dover, DE 19904

Smyrna Farmers Market
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Smyrna, DE 19977

FY23 Street and Alley
Infrastructure
Bidding
$2,000,000 CJ est. value
Dover, DE 19904

Open End - Drainage Repair, Canal District, FY23-FY25
Infrastructure
Bidding
$4,000,000 CJ est. value
Dover, DE 19904

Calvary Baptist Church / Dover
New Construction, Infrastructure - 27,000 SF
Post-Bid
$9,000,000 CJ est. value
Dover, DE 19904

Laboratory Expansion - Bid Package 2: Steel, Carpentry, General Work
Addition, Demolition, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Smyrna, DE 19977

Loockerman Hall Renovation
Renovation
Results
Dover, DE 19901

Sod Farm Site Development
Infrastructure
Results
$200,000 est. value
Dover, DE

1165 South DuPont Boulevard Mixed Use Development
New Construction, Infrastructure - 57,600 SF
Pending Verification
$15,000,000 CJ est. value
Smyrna, DE 19977

Simons Corner Apartments
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Smyrna, DE 19977

Route 13 Forcemain Relocation - South Dover - County of Kent
Infrastructure
Conception
$5,000,000 CJ est. value
Dover, DE 19901

Rehabilitation of Bridge 2-010A on SR6 Woodland Beach Road
Infrastructure
Bidding
$21,000,000 CJ est. value
Smyrna, DE 19977

Construction Management Services
Renovation, Term Contract
Post-Bid
Dover, DE 19901

Last Updated 12/01/2022 03:13 PM
Project Title

SSC Renovation - Delaware Technical and Community College - Bid Package B

Physical Address View project details and contacts
City, State (County) Dover, DE 19904   (Kent County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Project involves the interior and exterior renovation of the Terry Building with associated site improvements. This is a construction management project. Bids are to be for the following contracts: B-1: Site Work B-7: Acoustical Work B-2: Masonry Work B-8: Floor Covering Work B-3: Carpentry & General Work B-9: Caulking/Painting B-4: Furnish Hollow Metal/Doors/Hardware B-10: Kitchen Equipment B-5: Aluminum Storefront/Windows/ B-11: Mechanical Glass & Glazing B-12: Sprinkler System B-6: Drywall/Metal Studs/Exterior Panels B-13: Electrical Questions should be directed to the Construction Manager, Richard Y. Johnson Son, Inc. in writing only. The fax number is (302) 422-4696. Email questions to Attn: Jesse Dixon (jdixon@ryjson.com). A bid security in the amount of 10% of the bid must accompany each bid. Bid Security shall specify the Owner as the obligee. Owner: DTCC Terry Campus 100 Campus Drive Dover, Delaware 19904. Minority Business Enterprises (MBE), Disadvantaged Business Enterprises (DBE) and Women-Owned Business Enterprises (WBE) will be afforded full opportunity to submit bids on this contract and will not be subject to discrimination on the basis of race, color, national origin or sex in consideration of this award. Each bid must be accompanied by a bid security equivalent to ten percent of the bid amount and all additive alternates. The successful bidder must post a performance bond and payment bond in a sum equal to 100 percent of the contract price upon execution of the contract. The Owner reserves the right to reject any or all bids and to waive any informalities therein. The Owner may extend the time and place for the opening of the bids from that described in the advertisement, with not less than two calendar days notice by certified delivery, facsimile machine or other electronic means to those bidders receiving plans. Additional documents including plans are available from the owner. Construction starts January 2, 2023. Project has to be finished by June 1, 2024

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents