Similar Projects
Fire Station Number 6 - FM-22-1811 - City of Lawrence
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Lawrence, KS 66044

Pump Station 16 Upstream Interceptor Rehab - MS-21-0022 - City of Lawrence
Infrastructure
Conception
$1,170,000 CJ est. value
Lawrence, KS 66044

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

City of Lawrence Field Operations Campus
New Construction, Infrastructure
Design
$29,000,000 CJ est. value
Lawrence, KS 66044

Lawrence Multimodal Transfer Center
New Construction, Infrastructure
Bidding
$4,500,000 CJ est. value
Lawrence, KS 66049

Water Spray Park - Lyons Park
Infrastructure
Bidding
$348,157 CJ est. value
Lawrence, KS 66044

N1200 Road Improvements
Infrastructure
Post-Bid
Eudora, KS 66025

Linear Grading, Reinforced Concrete Pipe, Subgrade Modification
Infrastructure, Alteration
Post-Bid
Eudora, KS 66025

2021 Milling, Patch, Overlay, and Concrete Maintenance Program - Phase 1
Results
Lawrence, KS

2021 CDBG Street Restoration
Infrastructure
Results
Lawrence, KS

902 Storage / Lawrence
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Lawrence, KS 66049

902 Storage / Lawrence
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Lawrence, KS 66049

Concrete Channel West of Arrowhead Princeton to Peter - MS-21-0012 - City of Lawrence
Infrastructure
Conception
$1,500,000 CJ est. value
Lawrence, KS 66049

Eagle Bend and YSC Irrigation Water Supply Project - MS-20-0012 - City of Lawrence
Infrastructure
Design
$1,100,000 CJ est. value
Lawrence, KS 66044

2022 Sidewalk Hazard Urgent Repair
Infrastructure
Bidding
$390,000 CJ est. value
Lawrence, KS 66044

Last Updated 11/10/2022 12:18 AM
Project Title

Route 458/1055 Road and Drainage Improvements

Physical Address View project details and contacts
City, State (County) Lawrence, KS 66044   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $3,035,036 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Replacing All Cross Road Structures. FROM E1500 to E1600 AND N0925 to N1000 Douglas County Project 2016-17 consists of replacing all Cross Road Structures with Pre-Cast RCB's or Concrete Pipe, ditch reconstruction, flattening out of fore slopes, 100% new Aggregate Base, 8" of new HMA-Base, 2" of new HMA-Surfacing (PG70-28), Asphalt/Aggregate Entrances on N1000 RD, and Aggregate Shouldering. Reconstructing intersections at N1000/E1500 RD & N1000/E1600 RD. Adding a Turn Lane at N1000/E1600 RD. Milling (2" Nominal), HMA-Commercial Grade Patching, and HMA-Surfacing (PG70-28), and Aggregate Shouldering on E1600 RD from N0940 to N1000 RD. Project 2016-17 is located on Route 458 (N1000 Road) between E1500 and E1600 Roads approximately 3 miles south of Lawrence, KS. The anticipated "Notice to Proceed" is March 6, 2023. The late "Notice to Proceed" is May 1, 2023. This contract has 150 working days to be completed.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents