Similar Projects
RFQ D/B - Repairs/Upgrades to Mechanical, Electrical Systems \ Ft. Collins
Renovation
Sub-Bidding
$327,913 CJ est. value
Fort Collins, CO 80525

Estes Park Campground at Mary's Lake Water and Electrical Distribution System Improvements Phase 2
Post-Bid
$500,000 est. value
Estes Park, CO 80517

Holiday Lighting
Alteration
Post-Bid
Fort Collins, CO

Current Transformer
Infrastructure
Results
Fort Collins, CO

Wood Utility Pole
Infrastructure
Results
Loveland, CO

Emergency Power Projects
Renovation
Post-Bid
$800,000 CJ est. value
Fort Collins, CO 80521

District Generator Services
Term Contract, Alteration
Results
Fort Collins, CO

Service Center Administration Lighting Upgrade
Alteration
Post-Bid
$215,327 est. value
Loveland, CO 80537

Valley Substation Battery System
Alteration
Results
Loveland, CO

Transformer Boxpad
Alteration
Post-Bid
Fort Collins, CO 80521

FY 23 Signal Pole Replacement
Infrastructure
Results
$2,118,114 CJ est. value
Fort Morgan, CO 80701

Backup Generators
Alteration
Post-Bid
Fort Collins, CO

Lincoln Center Theatre Lighting Replacement
Alteration
Results
$700,000 est. value
Fort Collins, CO 80521

Lightning Protection for Water Treatment and Water Reclamation Facilities
Alteration
Post-Bid
$130,000 est. value
Wellington, CO

Pulse Locate Retrofits
Renovation
Results
$1,274,614 CJ est. value
Loveland, CO 80537

Last Updated 08/14/2023 06:06 AM
Project Title

Pulse Curb to Premise Conduit Installation

Physical Address View project details and contacts
City, State (County) Loveland, CO 80537   (Larimer County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The specifications and drawings are intended to supplement but not necessarily duplicate each other. Any work exhibited in the one and not in the other shall be executed as if it had been set forth in both so that the work will be constructed according to the complete design as determined by the City. Should anything necessary for a clear understanding of the work be omitted from the specifications and drawings, or should the requirements appear to be in conflict, the Contractor shall secure written instructions from the City before proceeding with the work affected thereby. Any detail that appears on one page of the drawings shall be as if it appears on all sections within the set of drawings. It is understood and agreed that the work shall be performed according to the true intent of the contract documents Questions concerning this Request for Proposals shall be directed to the Citys Senior Construction Project Manager, Kim Reeves at kim.reeves@cityofloveland.org. Reference Number 0000324534 Piggyback Contract No Bid Intent Not Available Questions are submitted online No The City of Loveland (City) is seeking proposals from qualified contractors to install a single empty conduit for Loveland Pulse from the handhole at the curb to premise. The City is seeking responses for a qualified contractor to install a single conduit from an existing handhole near the curb to the edge of the home. The conduit shall be swept into the handhole and capped by an appropriate means at the house. See Exhibit A for example. The City reserves the right to disapprove the use of any or all subcontractors that, in the Citys judgment, are not reasonably capable of performing the work required Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 %

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents