Similar Projects
Marymoor Stormwater Facility
New Construction
Conception
$900,000 est. value
WA

Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

Lake Hills Interceptor Corrosion Rehabilitation
Renovation
Design
$19,000,000 est. value
WA

I-405, Brickyard to SR 527 Improvement Project
Infrastructure
Bidding
$525,000,000 CJ est. value
Bellevue, WA 98006

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

Civil Structural Construction Work Order 2021-2022
New Construction
Post-Bid
$3,000,000 est. value
Seattle, WA

Interbay Forcemain and Odor Control Project
Renovation
Results
$1,100,000 est. value
WA

NE Spring Boulevard - 130th Ave NE to 132nd Ave NE
Renovation, Alteration
Results
$6,000,000 to $6,500,000 est. value
Bellevue, WA 98007

Boren Avenue Office Tower
New Construction, Infrastructure - 282,700 SF
Construction
$56,000,000 CJ est. value
Seattle, WA 98101

California Avenue Southwest Apartments
Demolition, New Construction, Infrastructure - 98,536 SF
Construction
$18,000,000 CJ est. value
Seattle, WA 98116

Chapter Buildings
New Construction, Infrastructure - 330,800 SF
Pending Verification
$88,000,000 CJ est. value
Seattle, WA 98105

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

SR 410/0.75 miles W of East Winter Gate - Culvert Lining
Infrastructure
Conception
$450,000 CJ est. value
Enumclaw, WA 98022

South Plant Dewatering and Truck Loading Bay Ventilation Improvements
Renovation
Design
$1,300,000 est. value
WA

Last Updated 03/13/2023 07:32 PM
Project Title

West Hill Springs Water Quality Improvements - City of Auburn

Physical Address View project details and contacts
City, State (County) Auburn, WA 98002   (King County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2025
Bids Due View project details and contacts
Estimated Value $480,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The aging chlorination building at West Hill Springs will be replaced and a new liquid chlorination system will be installed. As of March 13, 2023, this project is currently in the City of Auburn's FY 2022-2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents