Similar Projects
U.S. 17 Widening - South of County Road 309 to West of Dunn's Creek Bridge
Infrastructure
Design
$5,000,000 CJ est. value
Georgetown, SC 29440

U.S. 17 Widening - South of County Road 309 to West of Dunn's Creek Bridge
Infrastructure
Design
$5,000,000 CJ est. value
Georgetown, SC 29440

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Town of Andrews Drainage Improvements - Phase 2
Infrastructure
Post-Bid
$800,000 CJ est. value
Georgetown, SC 29440

Town of Andrews Drainage Improvements - Phase 2
Infrastructure
Post-Bid
$800,000 CJ est. value
Georgetown, SC 29440

Water Line Upgrades
New Construction
Results
Georgetown, SC

Safety Improvements - US 17A
Infrastructure
Results
SC

Woodside Village Zips Car Wash
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Georgetown, SC 29440

Whittemore Elementary School Property
Infrastructure
Bidding
Conway, SC

Center Road Water Line Directional Drill
Infrastructure
Post-Bid
SC

Safety Improvements - S-24 (Georgetown Co)
Infrastructure
Results
SC

Front St Underground Infrastructure T3 Upgrade - Phase 2
Infrastructure
Bidding
$60,000 CJ est. value
Georgetown, SC 29440

Mount Zion Water Line Materials
Infrastructure
Post-Bid
Georgetown, SC

Preservation - District 5
Infrastructure
Results

Last Updated 12/28/2022 03:06 PM
Project Title

Town of Andrews Drainage Improvements - Phase 2

Physical Address View project details and contacts
City, State (County) Andrews, SC 29510   (Georgetown County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Georgetown County is seeking bids for clearing, grubbing, storm drain system installations, utilities, grading, paving, and landscaping. The project involves demolishing portions of the existing drainage system and construction of a new larger conveyance system. Deadline for Questions: Thursday, December 15, 2022 3:00PM ET The Base Bid includes all components of the Project that pertain to site work to entail the civil and landscape portions of the Town of Andrews Drainage Improvements - Phase 2 plans. The project is intended to start in Jan 2023. The major components of the Base Bid include: Clearing and grubbing, storm drain system installation, utilities, grading, paving, and landscaping. The project involves demolishing portions of the existing drainage system and construction of a new larger conveyance system. The County will purchase the 36", 48", 60" and 72" RCP required for the project, the contractor is responsible for purchasing all other pipes and structures. The contractor will be responsible for installation of the County Purchase storm drainage pipes as well as all other drainage structures for the project. Contractor shall provide bricking of outfall hole for option #1 Myrtle Road Improvements during main pipe construction.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents