Similar Projects
Jan Road Levee Setback Construction
Alteration
Design
$9,000,000 est. value
WA

Fall City Floodplain Restoration Planting
Alteration
Design
$1,000,000 est. value
WA

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Bidding
$165,000,000 to $180,000,000 est. value
WA

Melrose I-5 Drain Crossing Rehabilitation
Alteration
Bidding
Seattle, WA

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

Geosynthetic and Erosion Control
Infrastructure
Post-Bid
WA

2021 Horse Creek Streambed Repairs Project
Infrastructure
Results
$90,000 to $100,000 est. value
Bothell, WA 98011

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

Riverbend Levee Setback and Floodplain Restoration Phase Two
Infrastructure
Bidding
$9,222,000 est. value
Renton, WA 98058

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

Storm Renewal and Replacement Project
Infrastructure
Results
$620,000 to $650,000 est. value
Auburn, WA 98092

Thorndyke Road MP 4.71 Culvert Replacement
Infrastructure
Bidding
$1,656,400 est. value

2442 WLSP Sinkhole Lake Restoration
Infrastructure
Results
$276,650 est. value
Bellevue, WA 98008

2nd Street Water and Roadway Improvements
Alteration
Bidding
$1,150,000 to $1,200,000 est. value
North Bend, WA

Eastrail North Segment Tie Removal and Interim Trail Phase 2
Infrastructure
Results
$1,280,212 est. value
Kirkland, Woodinville, WA

Last Updated 02/15/2022 02:03 PM
Project Title

Little Bear Creek Advanced Mitigation Site

Physical Address View project details and contacts
City, State (County) Woodinville, WA   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,031,167
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Contract Provides for the development of the Little Bear Creek Advanced Mitigation Site near Woodinville ,WA. The work includes weed control, stream diversion, wetland excavation, grading, planting, fencing, and other work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents