Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Single Asphalt Seal Coat, In-Place and Double Asphalt Seal Coat, In-Place
Infrastructure
Design
$200,000 CJ est. value
Albrightsvlle, PA 18210

Single Asphalt Seal Coat, In-Place and Double Asphalt Seal Coat, In-Place
Infrastructure
Design
$200,000 CJ est. value
Albrightsvlle, PA 18210

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Exterior Building and Site Improvements - Skyview Terrace-Grant Street and Willow Drive
Infrastructure, Renovation
Bidding
$2,000,000 CJ est. value
Punxsutawney, PA 15767

2022 Bituminous Paving Repairs
Term Contract, Infrastructure
Post-Bid
Reynoldsville, PA

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Plum Street Improvements Phase 7
Infrastructure
Results
$50,000 est. value

Coolspring North PM
Infrastructure
Results
$2,500,000 to $4,999,999 est. value
PA

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

I-80 Brookville East PM
Infrastructure
Results
$12,500,000 to $14,999,999 est. value
PA

Moore Bridge
Infrastructure
Conception
$1,435,200 CJ est. value
Polk Township, PA 15825

Last Updated 03/09/2023 12:35 AM
Project Title

I-80 Brookville East Reconstruction

Physical Address View project details and contacts
City, State (County) Polk Township, PA 15825   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected September 2025
Bids Due View project details and contacts
Estimated Value $230,356,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Along Interstate 80 from just west of Exit 78 (Brookville Interchange) to approximately 0.81 mile southeast of SR 1006 (Sulgar Road) in Rose and Pine Creek Townships and Brookville Borough, Jefferson County. Primary Improvement Type: Reconstruct As of March 09, 2023, the project is Future development stage. Anticipated letting date is July 10, 2025. PennDOT - I-80 Brookville East Reconstruction *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents