Project Title | Z2DA--642-CSI-117 Renovate MRI Suites for Equipment Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Philadelphia, PA 19104 (Philadelphia County) |
Category(s) | Medical |
Sub-Category(s) | Hospital |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall supply all necessary tools, labor, equipment, materials, and supervision required to construct General Construction and Alterations necessary for the complete renovation of the following existing spaces: AVANTO MRI ROOM 3A151, WAITING 3A151A, RECEPTION 3A151B, CORRIDOR 3A151C, CHANGING 3A151D, CHANGING 3A151E, CORRIDOR 3A151F, TECH AREA 3A151G, INPATIENT 3A151i, CORRIDOR 3A151J, MRI CONTROL ROOM 3A151K, CORRIDOR 3A151M, EQUIPMENT 3A151N, TECH AREA 3A151P, ESPREE MRI ROOM 3A152, CLOSET 3A152A, MRI CONTROL ROOM 3A152B and EQUIPMENT ROOM 3A152C. NOTE: This project is scheduled for two-hundred seventy (270) Calendar Days construction duration. (a) Demolition shall include, but not be limited to, the removal and disposal of all materials pertaining to the Architectural Finishes, Mechanical/HVAC systems, Fire Suppression systems and Electrical systems, as indicated on the plans and in accordance with the specifications provided. (b) New installations shall include, but not be limited to, new electrical power and lighting work, new Mechanical/HVAC work, Quench Piping work, Structural Members, and new Sprinkler Heads and associated piping system and alarming, as indicated on the plans and in accordance with the specifications provided. (c) Mechanical/HVAC systems shall include, but not be limited to, the installation of new diffusers and return air grilles, new Chiller (and associated appurtenances), new Condensing Units (and associated appurtenances), new Quench Piping transition piping, new support systems for a new MRI and new support systems for existing MRI upgrade. HVAC system shall be re-balanced. All devices shall be connected to the existing DDC control system so that temperatures and operations can be monitored by the VA. Connection to the DDC control system shall be tested before acceptance. All mechanical/HVAC work shall be installed in accordance with the provided drawings and specifications. (d) Fire suppression systems shall be revised throughout the limits of work areas, as per the drawings and specifications. The new sprinkler heads and associated piping, if any, shall tap into the existing system piping. All fire suppression work shall be installed in accordance with the provided drawings and specifications. (e) Structural installation shall include, but not be limited to, additional support steel required, due to the additional weight of the new MRI in ESPREE MRI Room 3A152. 2. In the event of any discrepancies between the drawings and specifications, specifications shall take precedence over the drawings. 2. Normal work hours are between 7:00 AM 4:00 PM Monday through Friday. Coordinate work schedule with COR. Weekend and night work, as required, may be arranged through the COR. Advanced notice must be given at least five (5) business days in advance to allow for access. Utility shutdowns shall be coordinated with the COR at least 2 weeks (14 calendar days) in advanced to allow the VA to prepare staffing for the event and properly notify the facility of the shutdown. 3. Contractor will be working in occupied buildings and will be required to conform to the Pre- Construction Risk Assessment (PCRA) and requirements in the Construction Safety Standards. Contractor shall be responsible for site security and properly installing and maintaining ICRA. Also, all ICRA doors shall be equipped with a push button cipher lock that has the capability for the VA to install a government issued key core. 4. Contractor will be working in a sensitive area of the VA medical center, which requires all workers to have proper identification while working on the VA s premises. The COR shall determine which type of badging the contractor and their workers are required to get before working on site. Contractors are allowed to use PIV cards from other government facilities, but those PIV card need to be current. Expired PIV cards will not be accepted. 5. All work shall be accomplished in accordance with federal, state, local, and VA guidelines, codes, and regulations. 6. Any damage to existing walls, ceilings, surfaces, equipment, furniture, utility lines, etc. shall be repaired to match existing conditions, at no cost to the VA. Contractor shall be responsible to make these repairs at their own expense. 7. After completion of work the contractor shall return all equipment and systems to operating condition with verification from the COR. 8. Contractor is responsible for the disposal of all waste and excess materials. Contractor shall not utilize VA waste containers to dispose of their waste and materials. 9. Contractor is responsible for clean-up of the work site and to remove and dispose of all trash and debris from site. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |