Similar Projects
Smith Lake Drainage Improvements - City of Wood River
Infrastructure
Conception
$1,900,000 CJ est. value
Wood River, IL 62095

Smith Lake Drainage Improvements - City of Wood River
Infrastructure
Conception
$1,900,000 CJ est. value
Wood River, IL 62095

Installation of a Second Water Meeting from Bethalto Water to Moreland Road
Infrastructure
Design
$1,750,000 CJ est. value
Bethalto, IL 62010

Installation of a Second Water Meeting from Bethalto Water to Moreland Road
Infrastructure
Design
$1,750,000 CJ est. value
Bethalto, IL 62010

Reconstruction of Lebanon Road on New Alignment to Facilitate Closure of Two Underpass Structures
Infrastructure
Bidding
$4,000,000 CJ est. value
Troy, IL 62294

Reconstruction of Lebanon Road on New Alignment to Facilitate Closure of Two Underpass Structures
Infrastructure
Bidding
$4,000,000 CJ est. value
Troy, IL 62294

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Wood River Recreation Center
New Construction, Infrastructure
Post-Bid
$7,500,000 CJ est. value
Wood River, IL 62095

Dale Avenue Water Main Replacement
Infrastructure
Results
$90,000 est. value
Troy, IL

North Buchanan Street Water Main Replacement Project
Infrastructure
Results
$200,000 est. value
Edwardsville, IL 62025

Starbucks / Collinsville
New Construction, Infrastructure - 2,226 SF
Construction
$400,000 CJ est. value
Collinsville, IL 62234

Addition and Renovation Dorris Intermediate School
Addition, Demolition, Renovation, Infrastructure - 14,000 SF
Construction
$6,000,000 CJ est. value
Collinsville, IL 62234

Home2Suites and Hilton Garden Inn / Edwardsville
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Edwardsville, IL 62025

Chick-fil-A / Glen Carbon
New Construction, Infrastructure - 5,000 SF
Pending Verification
$1,000,000 CJ est. value
Glen Carbon, IL 62034

Water Meters / Wood River
Infrastructure
Conception
$853,058 CJ est. value
Wood River, IL 62095

Last Updated 10/16/2023 11:01 AM
Project Title

Ridgefield Drainage Improvements

Physical Address View project details and contacts
City, State (County) Godfrey, IL 62035   (Madison County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $506,935 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 16, 2023, this project has not yet been awarded. The project is expected to be awarded on October 17, 2023. The scope of work for this project includes the construction of dry basins for stormwater detention, the addition and replacement of stormwater pipe networks, the construction of a culde-sac at the eastern end of Ridgefield Drive, and other related work as further described in the Project Manual. Questions regarding technical aspects of this project should be directed to: Rich Beran, P.E., Village Engineer, at (618) 466-4319 or rberan@godfreyil.org. Each Bid must be accompanied by a cashier's check, a certified check, or a Bid Bond executed by the Bidder and an approved surety company, made payable to the Village of Godfrey, in an amount not less than five percent (5%) of the sum total of the bid. Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12). The Village reserves the right to reject any and all bids and to waive all informalities in Bids. By submitting Bid, Bidder agrees that their Bid will not be withdrawn for a period of sixty (60) days except as provided herein, subsequent to the specified time for receipt of Bids and further agrees to the terms and conditions of this invitation and the Project Manual regarding the bidding process. No low Bidder shall have a business expectancy merely because their Bid is the lowest one received: until the contract has been awarded, no business expectancy exists. Bids may be withdrawn solely for demonstrated and verifiable clerical or typographical mistake, but not mistake of judgment.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents