Similar Projects
Shiocton - Seymour Const / Resur
Infrastructure
Design
$8,000,000 CJ est. value
Black Creek, WI 54106

Shiocton - Seymour Const / Resur
Infrastructure
Design
$8,000,000 CJ est. value
Black Creek, WI 54106

2021 Culvert Pipes
Post-Bid
WI

New Trail Minor Block Retaining Wall Miscellaneous Grading and Riprapping Restoration
Alteration
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Greenwood Road Roadway Reconstruction
Results
Greenville, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Appleton Public Library Construction/Renovation BU 32C Landscaping / Irrigation
New Construction, Infrastructure - 120,000 SF
Pending Verification
$4,531,723 CJ est. value
Appleton, WI 54911

Kwik Trip #887 Building Addition / Grand Chute
Addition, Demolition, Infrastructure - 1,463 SF
Pending Verification
$400,000 CJ est. value
Appleton, WI 54913

Stephensville - Shiocton Const / Resurf
Infrastructure
Design
$3,000,000 CJ est. value
Hortonville, WI 54944

Snow and Ice Plowing: Airport Landside
Term Contract
Post-Bid
Appleton, WI 54914

Railroad Street and Creekview Lane Street Reconstruction
Results
Kimberly, WI 54136

Garrow Oil & Propane Storage Building
Addition, Demolition, Infrastructure - 3,936 SF
Pending Verification
$500,000 CJ est. value
Appleton, WI 54913

T. Grand Chute, College Ave Des-Bld / BRRPL
Demolition, New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Appleton, WI 54914

Last Updated 12/02/2022 01:06 PM
Project Title

Grignon Park Stream Restoration and Utility Relay

Physical Address View project details and contacts
City, State (County) Kaukauna, WI 54130   (Outagamie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The estimated major quantities of 12-22 are listed below: Stream Restoration: Furnish and Install Clearing & Grubbing, 2.57 Acres Furnish and Install 48 Inch RCP Class III Culvert, 56 LF Furnish and Install Medium Riprap at Endwalls, 37 CY Furnish and Install Stream Bank Restoration (includes 6 Topsoil), 0.45 Acres Furnish and Install Stream Restoration Heavy Riprap, 437 CY Furnish and Install Restoration Above Stream Bank, 2 Acres Furnish and Install Gravel Trail Restoration, 108 SY Remove Concrete Abutments, 2 each Furnish and Install Trackout Control Device Furnish and Install Inlet Protection Sanitary Sewer Replacement: Furnish and Install 12 Inch Sanitary Sewer, Pipe Bursting, 1,309 LF Furnish and Install 48 Inch Sanitary Sewer Manhole, 80.18 VF Furnish and Install Connect Sewer Lateral to Sanitary Sewer, 1 Each Furnish and Install Gravel Trail Restoration, 55 SY Furnish and Install Restoration Above Stream Bank, 70 SY Alternate Sewer Replacement: Furnish and Install 12 Inch Sanitary Sewer, Directional Drill, 1,257 LF Furnish and Install 48 Inch Sanitary Sewer Manhole, 50.06 VF Furnish and Install Gravel Trail Restoration, 38 SY Furnish and Install Restoration Above Stream Bank, 75 SY The above work will be let to the lowest responsible bidder and must be performed in accordance with the specifications and contract now on file with the City Clerk/Treasurer. No bid can be received or considered unless accompanied by a certified check equal to five percent (5%) of the bid, or a bid bond in equal amount payable to the City as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within ten (10) days from the date of the lowest responsible bidders bid is accepted. In case the bidder fails to file such contract and bond within the time set by the City, the check or bid bond shall be forfeited to the City as liquidated damages. The board reserves the right to reject any or all bids. to complete the work by March 31, 2023

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents