Similar Projects
Concrete Floor Staining, Polishing, and Sealing
Post-Bid
Cabot, AR

Stripping and waxing all VCT Flooring on Campus
Post-Bid
Quitman, AR

Z1DA--564-21-3-632-0001 - Proj. 564-19-601 Replace Flooring and Expansion Joints
Term Contract
Results
$250,000 to $500,000 est. value
Fayetteville, AR 72703

Removal and Installation of Flooring
Term Contract
Results
$25,000 to $100,000 est. value
Jacksonville, AR 72078

First Floor Window Replacement
Alteration
Post-Bid
Helena, AR 72342

MWTL New Flooring
Term Contract
Results
Ashdown, AR

Polished Concrete Bid
Alteration
Post-Bid
Dover, AR

Remove And Replace Flooring At Central Fire Station - First Floor
Alteration
Results
Hot Springs, AR

Responsive Education Solutions - Installation of Floor Tile
Term Contract
Post-Bid
Bentonville, AR 72712

Gym Polished Concrete Bid
Alteration
Results
$200,000 est. value
Dover, AR 72837

S--Replace Carpet in the Administration Building
Term Contract
Post-Bid
Hot Springs, AR 71901

Flooring Replacement at Gloster Court
Alteration
Post-Bid
Malvern, AR

Flooring and Tile Installation Services
Alteration
Post-Bid
Pine Bluff, AR

Plastic Tiles for Road Department
Alteration
Post-Bid
AR

Carpet Replacement
Term Contract
Post-Bid
Little Rock, AR 72099

Last Updated 06/17/2022 07:48 AM
Project Title

Carpet Replacement at Various Schools

Physical Address View project details and contacts
City, State (County) Magnolia, AR   (Columbia County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

You are invited to submit sealed bids on providing labor and material for the removal and replacement of carpet and tile at various schools in the district. There is approximately 70,000 sf of glue down carpet to be removed and replaced with new VCT . There is approximately 2,600 sf of ceramic tile to be removed and replaced with new porcelain tile. It is the intent of the Magnolia School District to enter into agreement to replace the flooring during the summer of 2022. The Director of Support Services will help in all site visits. Failure to visit the school prior to sending a proposal will not relieve the contractor of any obligation to confirm their ability to perform the work indicated in the scope of work. The contract will be awarded to the qualified proposer whose proposal is most advantageous to the School District. The School District reserves the right to accept or reject any and all proposals, or part of any and all proposals, and to waive any informality in the bidding process. General Conditions and Scope of Services 1. Contractor is responsible for removal and disposal of existing carpet and tile 2. Bid price to include installation 3. Contractor is responsible for keeping all work areas clean and dust free 4. Vinyl cove base installed as needed 5. A certificate of Insurance must be filled with the school district by the successful contractor 6. All work must be completed no later than Friday August 5, 2022

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents