Project Title | MP11 - State Street 500 South Diversion Improvement |
Physical Address | View project details and contacts |
City, State (County) | Salt Lake City, UT (Salt Lake County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency - 02/03/21 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work includes the following: 1. Installation of approximately 450-feet of 30-54-inch FRP sewer main with the removal or abandoning of 1,000 LF of sewer main. 2. Installation of approximately 250-feet of non-linear Cured-in-Place Pipe (CIPP) within an existing 38-42-inch sewer trunk line located within the State Street and 500 South intersection. 3. Installation of a 16’X16’ Diversion Structure. 4. Relocation of 400-feet of 8-inch PVC water line. 5. Installation of 5 sewer maintenance access structures. 6. Construction of temporary bypass connections and bypass pipelines. 7. Performing all necessary by-pass pumping and odor control needed to complete the project. 8. Groundwater management as required for trench installation, including any treatment, handling and disposal in accordance with applicable permits and regulations. 9. Traffic Control permitting and execution during construction. 10. Performing public relations and outreach activities during construction. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |