Similar Projects
Dooley Court
Bidding
$1,097,130 est. value
Salt Lake City, UT 84102

On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

1800 North Sewer Realignment
Post-Bid
Salt Lake City, UT 84116

2018 West Jordan Manhole Raising Project
Results
$161,900 est. value
West Jordan, UT

104th and Bangerter Relocation
Term Contract
Results
Less than $1,300,000 est. value
Bluffdale, UT 84065

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

Installation and Repair of Sanitary Sewer Facilities
Results
Less than $125,000 est. value
Salt Lake City, UT

Manhole Lids, Rings, Monuments and Related Items
Term Contract
Post-Bid
Salt Lake City, UT

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

Cougar Lane Outfall 2A Sewer Relief Project
Post-Bid
Kearns, UT 84118

2018/2019 Various CIPP and Point Repair, Phase 1
Results
Less than $1,000,000 est. value
Salt Lake City, UT

Waste Water Sewer Cleaning and Maintenance
Term Contract
Post-Bid
Salt Lake City, UT 84114

Sewer Rehabilitation
Results
Less than $400,000 est. value
Salt Lake City, UT 84119

Drain Cleaning Services
Term Contract
Post-Bid
Draper, Ogden, Orem, Salt Lake City, West Valley City, UT 84020

Millcreek Guard Station Septic System Replacement
Results
Salt Lake City, UT

Last Updated 03/24/2021 02:29 PM
Project Title

MP11 - State Street 500 South Diversion Improvement

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 02/03/21
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the following: 1. Installation of approximately 450-feet of 30-54-inch FRP sewer main with the removal or abandoning of 1,000 LF of sewer main. 2. Installation of approximately 250-feet of non-linear Cured-in-Place Pipe (CIPP) within an existing 38-42-inch sewer trunk line located within the State Street and 500 South intersection. 3. Installation of a 16’X16’ Diversion Structure. 4. Relocation of 400-feet of 8-inch PVC water line. 5. Installation of 5 sewer maintenance access structures. 6. Construction of temporary bypass connections and bypass pipelines. 7. Performing all necessary by-pass pumping and odor control needed to complete the project. 8. Groundwater management as required for trench installation, including any treatment, handling and disposal in accordance with applicable permits and regulations. 9. Traffic Control permitting and execution during construction. 10. Performing public relations and outreach activities during construction.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents